Laserfiche WebLink
L <br />i <br />DATUM: <br />a <br />0 <br />0 <br />- or r <br />> L <br />' = C <br />j O <br />5 <br />i'ch FIL_E No. <br />CJ J <br />BOTANICAL NAME COMMON NAME SIZE COMMERCIAL <br />QUANTITY FERTILIZER <br />EACH (PACKETS ) <br />FESTUCA IDAHOENSIS IDAHO FESCUE LINER 561 1 PACKET <br />FESTUCA RUBRA 'MC, -ATE' RED FESCUE MOLr.1-E LINER 561 1 PACKET <br />PLF,NT LIST AND PLANTING SPEC' rICATIONS <br />BIOFILTRATION SWALES LINER PLANTS <br />VARIES <br />SEE DRAINAGE DETAILS <br />SLOFc HINGE POINT <br />— F.ROSION CONTROL (TYPE D) <br />(SEE NOTE 5) <br />FIBER ROLLS -- LINF, PLANTING AND <br />(SEE NOTE 5) ER JSION CONTROL MATERIALS <br />EROSION CCATROL (TYPE D) <br />(SEE NOTE 5) <br />/"a I _� <br />2' <br />I <br />8' Min 2' <br />LINER PLANTING <br />LIMITS <br />(SEE NO f E <br />4) <br />SECTION A -A <br />BIOFII ' RATION SWALES <br />LINER PLAN <br />"M" <br />31 +57.24 TO <br />33+14.08 <br />"M" <br />32+81.55 TO <br />40+OO.00 <br />"M" <br />32+81.61 TO <br />40+00.r,1 <br />"R" <br />10+20.00 TO <br />17+33 09 <br />' EROSIOrCONTROL k I �% <br />(SEE P;OTE 5) <br />Nill <br />BEGIN BIOALTRATIO <br />SWALES AT END Of <br />TRANSITION FROM <br />TRAPEZOIDAL DITCH <br />(SEE NOTE 3) <br />141, • 1 •I, •� A <br />LINER PLANTINr' <br />(SEE NOTE 4` <br />W W W <br />PLANT <br />SYMBOL <br />NO <br />1 <br />0 <br />2 <br />X <br />ZIES <br />I <br />EP <br />VARIES <br />NOTES: <br />1. EXACT LIMITS OF LINER PLANTING SHALL BE DETERMINED BY THE ENGINEER. <br />2. DIMENSIONS MAY VARY TO FIT FIELD CONDITIONS. <br />3. BEGINNING AND END OF BIOFILTRATION SWALES FIELD CONDITIONS MAY VARY. <br />SEE DRAWINGS DD-1 AND DD-2 FOR TRAPAZOIDAL DITCH DETAILS. <br />4. WHERE LINER PLANTS ARE PROPOSED, EROSION CONTROL MATERIALS SHALL <br />BE APPLIED IN ACCORDANCE WITH "BIOFILTRATION SWALES" OF THE SPECIAL <br />PROVISIONS. ALL OTHER DISTURBED SOIL AREAS SHALL RECEIVE EROSION <br />CONTROL (TYPE D). <br />5. FIBER ROLLS AND AREAS OF EROSION CONTROL (TYPE D) ARE SHOWN FOR <br />REFERENCE PURPOSES ONLY. <br />SLOPE HINGE POINT <br />--FIBER ROLLS (SEE NOTE 5) <br />/ EROSION CONTROL <br />MATERIALS <br />SECTION <br />"R" 14+50.00 TO 16+0'j.00 BIOFILTRATION SWALES STRIPS <br />3 <br />— TOP OF R0(' f BALL <br />`'' END BIOFILTRATION S�"TALES, 1" ABOVE ` G <br />RESUME TRAPEZOIDAL DITCH <br />(SEE NOTE 3) F T <br />I x x x ( O Q I — FIG <br />X O �F- _ McHenry Ave Corridor Improvement Project <br />r•^ror��ro►, roror�T�ro� /Tair�r rvk <br />X 10 ® .- <br />I =1 1_- <br />O0 0 1 x x ='1,_: AS -BUILT <br />I - - BASK, DIAMETER 6" <br />Resident Engineer - Mauricio Rivera, P.E. <br />0 x x x <br />'OSION CONTROL (TYPE D) �— J - N -_- C'JMMERCIAL Revisions By � � ,� - 9/28/2021 <br />=ERTILIZER <br />0 = FESTUCA IDAHOENSIS (PACKETS) <br />X = FESTUCA RUBRA 'MOLATE' <br />10 PLANTS PER 3 SQUARE FEET <br />PLANTING PLAN SEC -•ION <br />PLAN' r BASIN <br />T` PICAL LINER PLANT �`INER) <br />SPACING <br />SURVEY REVISION DESCRIPTION BY DATE SCALE P EPARI D BY DATE <br />P q u 1 N SAN JOAQUIN COUNTY PUBLIC WORKS <br />+wlc i - C-LilVill" ATE PLLvV 1 J i iAiVv e- <br />I NO SCALE <br />I HORIZONTAL F_ CIeMARCn Ci9—�9-1 R � l� <br />VERTICAL. �_ -AMcHENRYDESIGNED. R. GIBSON 09-29-16 N: AVE ID <br />T N R I EN0 1 2 ECH ICAL SERVICES, INC. <br />I I I I I CHECKED: K. OAKS 09-29--16 2020 L STREET, SUITE 300 <br />INCHES SACRAM A95811 EROSION CONTROL DETAILS <br />a 10 za so ao so APPROVED: T. BARNARD 09-29-16 T 916.414-5800 .5800 F916.414.15.57 c ' • �- � .P <br />0. -R <br />- - MILLIMETERS <br />FILE NO, <br />DRAWING <br />Q(Z® SS/ <br />`�° '' '• �ti <br />ECD-1 <br />RASHO J. GIBSON �. m <br />OF <br />• No. C70999 ; <br />*;•Exp. 06-30-17•.'* <br />ECD-1 <br />(1'0•• C 1 V\\-...- <br />'� Of � <br />SHEET <br />CAUF <br />56 OF 176 <br />