My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9 <br />...... ..... .. <br />--ot <br />E <br />Cl, <br />m TEMPORAF <br />0 x — ___J FROM STA <br />TEMPORARY FIBER <br />0 <br />CN KULL, I yp <br />1.6 <br />0 <br />!D� <br />00 <br />N <br />N <br />SURVEY REVISION DESCRIPTION <br />DATUM: <br />:3 <br />fa, FILE No.: <br />0 <br />_J - <br />TEMPORARY SILT FENCE <br />FROM STAGE 2A, Typ <br />TEMPORARY FIBER ROLL, Typ <br />BY DATE SCALE <br />HORIZONTAL: <br />VERTICAL: <br />01 $ <br />TEMPORARY41 ,NL�T PROTECTIO <br />TEMPORARY CON <br />111 <br />WORARY FIBER ROLL.,�,, <br />FROM STAGE 1 A, Typ <br />TEMPORARY FIBER ROLL <br />FROM STAGE 2A, Typ <br />TEMPORARY SILT' FENCE <br />FROM STAGE 1 A, Typ <br />R/W <br />V, p <br />R/W <br />TEMPORARY SILT FENCE <br />FROM STAGE 1 B, Typ <br />TEMPORARY INLET <br />PROTECTION <br />-_.......—FROM STAGE 2A <br />TEMPORARY INLET <br />PROTECTION ,Won* 0 0 <br />FROM STAGE 2A SAN JOAQUIN COUNV 0 1 <br />. . -�r * COUNTY <br />COU <br />www"D <br />NO CHANGES <br />PREPARED BY DATE a.( N SAN JOAQUIN COUNTY PUBLIC WORKS <br />,M A A <br />McHenry Ave Corridor Improvement Project <br />Date Accepted _ <br />AS —BUILT <br />Resident Engineer - Mauricio Rivera, P.E. <br />Revisions By 01MAAXCG'Jun98,2021 <br />I =lf+U DRAWN.- <br />F. DeMARCO 09-29-16 <br />N/A JOWZ11111111lufm -T., k I AX/1: PnODInnO IRADOM/ClACKITC <br />0 <br />INCHES <br />a 10 20 30 <br />I I MIL.. MFT9S <br />40 <br />1 <br />ON GIB R. S09-29--1 6 cn <br />DESIGNED: RTECHNICAL SERVICES, INC. IVIU11F. rx 1 <br />2 <br />CHECKED. K. OAKS 09-29 —116 2020 L STREET, SUITE 300 <br />SACRAMENTO, CA 95811 TEMPORARY WATER POLLUTION CONTROL <br />APPROVED. T. BARNARD 09-29-16 T 916,414.5800 F 916.414.1557 <br />STAGE 2 PHASE B <br />FILE NO. <br />DRAWING <br />of <br />V <br />WPC-12 <br />39140 Gi N N <br />F <br />AJ <br />No. C709 9 <br />9 <br />**.,Exp. 06--30-17 • <br />WPC-1 2 <br />C'lv�` <br />SHEET <br />81 OF 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.