SPECIAL CONDITIONS <br />Maintain traffic controls for all roads. Two-way traffic shall be maintained during non-working hours <br />with excavated areas backfilled or plated. <br />Applicant shall notify and coordinate with all emergency services (fire, police, etc.), local schools <br />and the local postmaster a minimum of seven (7) days prior to the road closure. <br />Contractor/Applicant will notify San Joaquin County Road Maintenance (209-468-3074) and Field <br />Engineering (209-953-7421) 48-hours prior to any road closures with location, date and duration. <br />Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />Any areas where parking is to be restricted shall have signs noting the restrictions in place at least <br />48 hours in advance. <br />All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead legends, <br />limit lines, raised pavement markers and miscellaneous delineators. <br />The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may be <br />disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record filed <br />with the County Surveyor. Any Survey Monuments disturbed during the course of construction <br />shall be reestablished by a Licensed Land Surveyor and another Corner Record filed with the <br />County Surveyor. (Land Surveyors’ Act Section 8771) <br />County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />The contractor shall not conduct construction operations in rain or heavy fog conditions.