My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301001 thru PS-2301500_ - PS-2301431
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301001 thru PS-2301500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301001 thru PS-2301500_ - PS-2301431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 2:44:08 PM
Creation date
5/8/2025 2:37:57 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301431
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Location
Pock Lane N/O Duck Creek to Pock Lane and 11th Street
Type - Permit Process
Pock Lane Subdivision Improvements (Unit 1 Phase 1)
Address
4830 Business Center Drive, Fairfield,CA 94534
Application
KB Home
Project #
790145
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2301431 – Rider # 2025 <br />SPECIAL CONDITIONS FOR <br />POCK LANE UNIT 1 PHASE 1 IMPROVEMENTS <br />ENCROACHMENT PERMIT <br />1. Work shall only be conducted by a California Class A licensed contractor. <br />2. PCMS shall be placed 72 hours in advance of any closure at Pock Lane and Carpenter Road, <br />Pock Lane & 8th street, and on D Street just before the closure. The PCMS boards shall describe <br />the closure, closure length, and how to access Kennedy Community Center during the closure. <br />3. Monroe Elementary School & Hamilton Elementary School shall be notified a minimum of 72 <br />hours prior to any closure. <br />4. SJ RTD shall be notified of any closure that impacts their existing routes 72 hours prior of any <br />closure. SJ RTD maps route maps can be found here: https://sanjoaquinrtd.com/systemmaps/. <br />5. Access to the Kennedy Community Center and Park shall be maintained at all times. <br />6. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />7. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />8. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />9. School Buses shall be passed through the work zone with minimal delays. <br />10. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br />11. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421. <br />12. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />13. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771)
The URL can be used to link to this page
Your browser does not support the video tag.