Restrainer
<br />(Hinge sid
<br />Nut with thread
<br />locking system
<br />I I I I ��I�I�I�IIIII III I�111111111111 \)
<br />Steel Washer
<br />Disk Springs -
<br />-IV I r cal washer
<br />Hinge Side
<br />1.50" ±0.01 "10.
<br />- 1.125 -0
<br />+0.03125
<br />after goly.
<br />A I I A
<br />END VIEW
<br />Reduced section length Wall thickness
<br />0.500" ±0.001 " � �_0.25" :L0.01 "
<br />Steel Spherical Washers
<br />Cable Yield Indicator
<br />Thick Steel Washer
<br />II
<br />4 Y � I I111111111111111111111� � III I
<br />_.
<br />Nut with Thread
<br />Locking System
<br />3/8' 318"
<br />5 1116 /
<br />1 0 x 1 0 Stud
<br />(threaded entire length)
<br />Swaged fitting and Stud
<br />Pier Side
<br />Disk Springs
<br />Restrainer Bracket
<br />(Pier side)
<br />DISC SPRINGS AND WASHERS
<br />DISC SPRING STEEL SPHERICAL WASHER
<br />CABLE UNIT ID OD t H CODER ID OD Nothik
<br />1.00 2.00 0.065 0.130 WHITE 1.19 2.25 0.50
<br />OD
<br />ID
<br />PLAN
<br />ID
<br />Front of
<br />disc
<br />SECTION B-B
<br />L ( Single spring )
<br />0
<br />/ Reduced section
<br />+� I Wall thickness
<br />o \ � 45° Bevel � � ��---------�'
<br />N Q) ---
<br />G/ — — — — — — — — — — \
<br />SECTION A -A AS INSTALLED ON STUD
<br />CABLE YIELD INDICATOR
<br />All dimensions are before galvanizing except as noted.
<br />DISC SPRING
<br />Note: For dimensions not shown, see table.
<br />THICK WASHER
<br />ID OD t
<br />1.03 2.00 0.25
<br />"Minimum value
<br />NOTES: 1. All dimensions in inches.
<br />2. All OD and ID dimensions for washers and disc springs shall
<br />meet the dimensional tolerances for harden steel washers, ASTM F436
<br />RESTRAINER INSTALLATION PROCEDURE
<br />1. Install disc springs on Hinge side of cable system using spherical washers to align
<br />discs to stud. Discs shall be
<br />installed front to front as shown in "Disc Spring" detail.
<br />Install Cable
<br />Yield Indicator and
<br />Spherical Washers on the Pier side of restrainers
<br />as shown in
<br />" Coble Unit detail.
<br />2. Place thread
<br />locking system on
<br />Hinge side stud prior to setting the cable.
<br />3. Tighten the cable from Pier side
<br />of restrainer until the disc springs collapse and
<br />there is no
<br />disc gap remaining
<br />between the discs. The cable should be approximately
<br />straight with
<br />no sag.
<br />4. Place thread
<br />locking system on
<br />Pier side stud after tightening the cable, but before
<br />backing off
<br />the nut. Back off
<br />the nut at Pier side a distance equal to maximum additional
<br />amount that
<br />the hinge joint is
<br />expected to open as shown in Table A.
<br />NOTE: if the cable needs to be secured from turning while tightening,
<br />use double nut locking technique on the stud to protect the threads.
<br />TABLE A
<br />Ambient Back Off
<br />Temp (F°) Turns
<br />E% J k lli 4 6 S 01 hilecora
<br />' ( 40 to 80 4
<br />Date �:, W.; >80 4NOT S.-
<br />1. The Contractor shall verify all controlling field
<br />dimensions before ordering or fabricating any material.
<br />2. See General Plan for Legend.
<br />�.mLL �Ii a Lllliladll d.1161 .aedl. �dl' d'IL J�iJi Yuou ��i dl l,i lJe aY III I.. Wei. ��Ifaa IYIJ II. I ��Ylul�l�lllu���IY.�I�e.WI�IY�����l ul�u���lu��l, i14l �. �d���,���iiuu lliuolllYl l�I�YI��i.�Yallli�ll����uau'i� • � � �. �, �� � � .
<br />II Jlnl� m� n�ell llui� i li��l I�n�.11l� lu.d�a�i II+Jlei�l.lul���n Jul�iln lei 4116Jilil I... I I. it e���ll�l i�.ii � � � �i �.INi�iuLlli1�11�1 slid li ii i li Ywil�ll uii i �i.id�ll i� i u� ul..nlnni �I�d�u Il. ��Jull ul� I�uI. nI11�lY n�ellul �. �� I rill llil�l� 411ui IiYi ��i aid 1. �e uulim u I li ii I�il�l� ....I �I�I.i iYi I ..0 Y.il�llnl� I to �I� Jn �i�nl illl.�wuilmi II.. .,lei th �. �� I I . i91 ��i I... L � I � �i .en Yi I I Ilia �e n�l�l ll.I 4 11u �d lei i lld�uiu l�Il I,iII��i�Y � I .III i! Iii I II l.l: 1 I.I. � III I1 Y, ia]iiin YI I ,i HI.. ual 'd illl ill iL lil Ili,, InILn I Illli i.Y,ilnl In Ils o�I. I. I���n I. 1l�l���le u 4.1 I. 1ai Y.� l�llI��uIII�I.I,.
<br />1 I a. 111 I,n I .1 , 1 ol 111111 , I II1 lo1Yl I IIJIIIII I,I I II I I I�II,lnl��lI I��I,I II l��lI�. i II.I e l,l �� nil �I m I I&lll ll mlmlnu 1111 d1�o 1 a ,Y uld dl wuunl a1, IIIIuI 1.111 I1ullY�llni�i„Illlul��u..nt �111 ll�llll �Ji , ml.II,u�ll: IUIIiI1 lII�II�IuAL. l �ee IIY�II
<br />1IYiYIIJ II w l'ii&. I"e.lul.ldll lli ,Ill lni.ll, d Y. UJ IiIIIL e,i lll,.i lu e�Jhu.dh,,l,, mu ll.lIn III, I,Id llimu
<br />COUNTY OF SAN JOA UINT R A C Y BOULEVARD BRIDGE NO. 2 9 C— 0 2 2 �oVie, Consulting Structural and Civil Engineers SHEET N O
<br />pFESSI
<br />�� REINHARD P. 2� 170 Columbus Ave., Suite 240
<br />SEISMIC R E TR 0 E I T A C R 0 S S GRANT LINE CANAL LUDKE m II Creegan+D'Angelo SAN FRANCISCO, CA 94133-5160 RESTRAIN 10
<br />c� NO.: SE2545 m E R D E T A I L S 2 J.mo.11n�llul llu,nllll.IWnlm1 1alllll�l, lau��iwnidnil��u��w ,l� " ����� �� � � � � ,. �� ,�� �� w
<br />IYJI��nI.I��u.Yl��le���.�����Jlla,�lun„.Iul]��wl lll��.d�l ll t����IaiIY�II. Io �����I�II�I �� �� �� � � � � �� —. .III IYlldlidu la I. L L. ull uuLei IL,. �e I. �1
<br />.mu w.�L.. � I,����u��:,�tleu ���.mmu���a IIJI��.Ln� I.mll l:lenl In. .,ll�.a I , n l o-al IL L...,....L..I o:a �,I,I,IIUILYI ,nI .IIIYJ Yxm.L u.Iwu �ILu�IIieI�L .lip lu I L�uln.11d nuum ��o I. ,a. al ll �� I iiuOLlYu�l 1�dY gel I lae: �� Ime iwln eW ��� I41 ru well n�m����nu ���m�,�Luk ei lint �[�o� u�u��YNueal I YI :..I �m� xdllle i � � � .� I I .I,YII I II iliY.mJ l .Illi.11lnlllllulill lln nl 1. I. IeI I,II,IIIJIII..I ILI IY.�I Nell ll.I I,I,Illeei� ilal�lll0 .I II, II Lllllillll,llilil ,al Y:nY llll I I nlnllY. IIY II.I.Illlll l lnlll.l, IIIIII,.II,JJ...IL.eli illYei:Lllillll ..IJlnl.l:n ..e�ailillille]nllli ll l i � EXP.:3/31/07 � — 11
<br />STRUCTURAL (41 � 83 10/jx:(415) 834 20 of
<br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVAL RECOMMENDED DATE �sT
<br />A�
<br />c F
<br />- =L / of �� � ,�� F o �
<br />E. GARRO 8/21 /98
<br />204039.00 8/ 21% 98 M. SALMON 8/ 21/ 98 r I� � � � ISTERED CVIL DATE 13—
<br />
|