I �, LY. III I I. a 6� � III aI I I Y �.. �. � � � �. � � � � I �.� � I I � �d�I I a r� I u l l �I�I II I � I. � � 11 'III ul I u In I u IIIIIII ��� W11��1 IIII 11 All —
<br />I J�II I Y! IIII Y ��W Y � II I IIII IIIY •II uI� I { u � I IY '161 I I IYI I I I '. I � I I � u A ���II.I � � ulll II I II IIIUII IIII 9 1 We lu•Y, II ' I I.II II11 111 Y I IIII 1. Y III II I I. IIII I YII,IIiIII�I I{I I. YII KIWI IIIIYu'I I II�u�ldl�ul III 411 I Y YlY I Y I fill. 'I I'�I'�I u11 III' IIIIIII n III .IIIII hil l Lull J6iilrl I I�.IuIIIIIII uWI�IIuf rill � � � � � � � � � � 'I I II 'Iu41�I I. �4Y' ulllu l..I I uII�I� I II I IIIIII YIII II{IIIIIII YIII IIIIIII lul I I IIIII III 1141II III. IY I II ItlY i I I I II.I 101 III II�JIeIII III III II•I�IIi. Ie�dY I (IIIIIII IY III .IL��IYI 61 o1JmlY I IIII I.J.I.IIit II IIIIII III IY IIdII I I Iu I I. II �� l II I YI Y IItI�II I I ��IIII I161I IIII I. IYLI IIYI�II tlII IJee IIIIh III.III��IiI IIII I I. IY II .u�aYI III YI •IUYI.I IYiJ�IIIYII If u.Y IIIII IIII II I 1 II I I I II �I,I Y 4 1 tl I�lull II I III 1 �II41uIl II II II JII� IIY { II 'I ' I��IYII�II I I I II I��I�Y 111 Illfl' IIIIII IIIYI Y 'IIII '111 I Yu 11 III I I I I,I IN, II 011u Iu�I I II III I IW I 1 IIII I I I 'II I�,I I Y I I IIII I I. ill I .I III Ili II I � u I I
<br />MRO ENGINEERS INC. AND COUNTY OF SAN I
<br />JOAQUIN OR ITS OFFICERS OR AGENTS SHALL NOT y
<br />BE RESPONSIBLE FOR THE ACCURACY OR
<br />COMPLETENESS OF ELECTRONIC COPIES OF THIS
<br />PLAN SHEET.
<br />i
<br />i
<br />r
<br />RETAIN EXITING WINGWALL
<br />AT THIS LOCATION
<br />WILSC
<br />q BIl
<br />REMOVE AND DISPI
<br />OF EXISTING WING1
<br />-- — E ---
<br />N 'ti
<br />I M
<br />[Ul
<br />,
<br />m ..
<br />to
<br />l- w
<br />4
<br />m
<br />_
<br />pQ
<br />r
<br />~�
<br />W Z
<br />m
<br />W
<br />m
<br />LJ
<br />m
<br />/W� y
<br />W
<br />ED •
<br />mit
<br />P LA N
<br />SCALE: 1 " = 20'
<br />REMOVE AND DISPOSE OF TEMPORARY SUPPORT, SEE "HINGE
<br />EXISTING ABUT W/ SPREAD REMOVAL AND CONCRETE REPAIR
<br />FOOTINGS, TYP --� DETAILS" SHEET, TYP --,_
<br />ABUT 1
<br />ELEV 11.61 _
<br />BENT 2
<br />BENT 3
<br />k2s q
<br />EXIST HINGE
<br />REMOVE EXISTING
<br />COLUMNS AND SPREAD
<br />FOOTING. TYP
<br />0
<br />i
<br />SEE N
<br />NOTE 6...•
<br />ELEV 7.8±
<br />BENT 4
<br />REMOVE EXISTING T-BEAM
<br />SUPERSTRUCUTRE— EXIST HINGE
<br />9
<br />-ELEV 7.8f i E
<br />BENT 5 BENT 6
<br />BENT 7
<br />rREMOVE AND DISPOSE
<br />OF EXISTING WINGWALL
<br />WINGWALLS FROM EXISTING T-BEAM
<br />BRIDGE MAY STILL EXIST BELOW
<br />GRADE AND MUST BE REMOVED
<br />DURING DEMOLITION. SEE
<br />DEMOLITION SEQUENCE
<br />NOTE 2, TYP.
<br />68+00
<br />1
<br />REMOVE AND DISPOSE
<br />OF EXISTING WINGWALL
<br />- --
<br />- -A,-�:-
<br />t
<br />r
<br />m
<br />m
<br />BENT 8
<br />ELEV 11.6t
<br />�j
<br />i
<br />1'-0"
<br />TYP
<br />q ABUT q BENT
<br />8'-0"f 1'-0" _ 6'-0"t
<br />TYP - I
<br />TYPICAL AT TYPICAL AT
<br />ABUTMENTS ALL BENTS
<br />EXCEPT BENT 5
<br />q BENT
<br />1'-0" _ I I _ 13'-0"t
<br />TYP �
<br />BENT 5
<br />LIMITS OF CONCRETE REMOVAL
<br />AND STRUCTURE EXCAVATION O
<br />ABUT BENT
<br />\_ APPROX
<br />- --_ FG
<br />APPROX
<br />FG
<br />I I
<br />BOTTOM OF EXISTING
<br />FOOLING 7
<br />5'-0"f I - - 5'-0"f 4`l 4'-O" f
<br />TYPICAL AT TYPICAL AT
<br />ABUTMENTS ALL BENTS
<br />EXCEPT BENT 5
<br />LIMITS OF STRUCTURE BACKFILL(Al
<br />i
<br />j BENT
<br />7'-6" 7'-6"
<br />BENT 5
<br />(STING CONIC
<br />OUR PROTECTION
<br />RUCTURE
<br />APPROX
<br />FG
<br />_ BOTTOM OF EXIST
<br />SCOUR PROTECTION
<br />STRUCTURE
<br />REMOVE AND DISPOSE OF EXISTING SCALE: 1 /8" = 1'-0" LEGEND
<br />N CONIC SCOUR PROTECTION STRUCTURE DEMOLITION SEQUENCE: — - - - - — INDICATES EXISTING STRUCTURES
<br />0
<br />I
<br />co
<br />N 1. REMOVE AND DISPOSE OF EXISTING ORIGINAL REINFORCED 3. (CON-1 THESE RECTANGULAR AREAS ARE THE EXISTING DECK INDICATES EXISTING ORIGINAL
<br />ELEVATION CONCRETE T-BEAM BRIDGE. CLOSURE POURS BETWEEN THE ORIGINAL T-BEAM SPANS ANDEm
<br />CONIC T-BEAM BRIDGE TO
<br />N SCALE: 1 " = 20' THE EXISTING SLAB SPANS. EXISTING REINFORCEMENT SHALL BE REMOVED
<br />REMAIN IN PLACE AND UNDAMAGED. SEE "HINGE REMOVAL AND
<br />2. EXCAVATE, REMOVE AND DISPOSE OF EXISTING SPREAD
<br />3 FOOTINGS. EXISTING SPREAD FOOTINGS CONFLICT WITH THE CONCRETE REPAIR DETAILS" SHEET.
<br />a LOCATION OF THE PLANNED 24" 0 CIDH PILES. ALL EXISTING INDICATES EXISTING ORIGINAL
<br />o HINGE TO BE REMOVED
<br />SPREAD FOOTINGS AT ABUTMENTS AND BENTS SHALL BE FULLY 4. PROVIDE TEMPORARY SPAN SUPPORTS AT EXISTING HINGE
<br />m EXCAVATED AND REMOVED INCLUDING WINGWALLS (IF PRESENT) LOCATIONS PRIOR TO OCTOBER 1. EXISTING STEEL HINGES AND
<br />N AND INSTALL EARTH RETAINING DEVICE ON EXCAVATION ALONG SURROUNDING CONCRETE SHALL BE REMOVED AND DISPOSED - INDICATES LIMITS OF STRUCTURE
<br />N WILSON WAY/ APPROACHES. STRUCTURE BACKFILL SHALL BE OF. EXISTING LONGITUDINAL REINF SHALL REMAIN IN PLACE AND EXCAVATION FOR EXISTING Z
<br />0
<br />PLACED AT 95X RELATIVE COMPACTION TO FILL THE EXCAVATED UNDAMAGED. STRUCTURE d
<br />V HOLE. BACKFILL SHALL BE PLACED TO MATCH ORIGINAL :3
<br />o SURROUNDING GROUND ELEVATIONS. 5. REMOVE AND DISPOSE OF EXISTING SCOUR PROTECTION
<br />STRUCTURE. STRUCTURE IS APPROXIMATELY 32'-0"t LONG INDICATES LIMITS OF STRUCTURE
<br />all3. REMOVE AND DISPOSE OF EXISTING DAMAGED CONCRETE AT THE " - BACKFILL FOR NEW STRUCTURE
<br />L AND 12 -4 f WIDE.
<br />0° RECTANGULAR AREAS THAT ARE SET INTO THE INSIDE EDGE OF
<br />3 THE EXISTING REINFORCED CONCRETE SLAB SPANS.
<br />6. SMOOTH GRADE CHANNEL BANK UNDER BRIDGE TO THE CONTRACTOR SHALL VERIFY ALL CONTROLLING J
<br />ELIMINATE IRREGULARITIES CAUSED BY EROSION, LYP. FIELD DIMENSIONS BEFORE ORDERING OR N
<br />31
<br />FABRICATING ANY MATERIALS.
<br />46
<br />Y I Y.dW. , I I. x " � � Y IIII n 1 eul I I IY IIII II Ill unl 11l I, IY.Juu Ili YII II I�i IL ,. I (YII nl n IwIL
<br />Y , I Ylf nllu ll gill. 6 11 II IIIIII .IIIII a L.I e�.1 I e YIII IIII 1 Y III �IInI' I �'x 1 I Y u �I uh1 61I .ILLY IIIIuI P AN, xI , Y OIn. Y�. I' Im IY I" I I Ira Ili I liltYl Y IbI.IY YY Il ill uYl II I InIIJ III I ally YW fI II Tun II I�YW��III Ir 4W IIIYU II YI uY IYYIIu III LII It YII � IYI I �
<br />Y III IJIJm � u111Y tlu11, 61L1 IJ,II'a.Y II IL YIY I .tlJIY J..I �. I I �. I I W. ulll I I, I L �u f � Y �J �u� u Y 'I 'IIII I �dl l I 11 III uu III Il e.Il I YIWIIhoI Id wltl Jl. 1 nI�I lu I I w11 e� Y ul ulll lnli I JI�Jv II IIIIIII II III I I IUI IIIII t 011 u , IIII JUI e1110 III I'll I I I II � . I .II
<br />11 I���I.�I III III I��I.�I,I I III II IIL�IIuI _III J.YJ 1 IIIIIIII�II I_ I .'Y IIII�II��l� I...1 I IIIu IIIY IWIIIII �� ,II AlYII WWII III'Y IIIII II. 11 I 1I����I II sY II'I III Y.. III Y II Ill�uYl II '1 II I��II.II I.I YI II I li IIIIIue�Il I II IULI IIII 1 I IIII �IUY YII"LI I�IYI II Ili ull I Yu II,II�II �o� ll llu III 61I I h� YY u I ullll IY II 1Y IXI 1114 I I II d�IIII I lu IILIe IIIII I.I �IIL I I IIYI I I IIII Y II IIIII I 41 .I IIY I Z
<br />o ! - MRO Engineers, Inc. Q E SHEET NO.ig
<br />WILSON WAY BRIDGE NO.29C 948 REHABILITATION 1 ICY �i 2202 Plaza Drive Ill belx I'lluIl 14 J NNIII Id A111111111Ill IIIIIY dIh JiII IdP Q
<br />N COUNTY OF SAN JOA UIN Q Rocklin, CA 95765 �, m
<br />z ACROSS STOCKTON DIVERTING CANAL Phone (916) 783-3838 RoalCL Riv9t DEMOLITION AND EARTHWORK 9 a
<br />I uL�IIIII, I Y I, II II I' II IYYW d I' I.. Ill I ' J � IIIIJIIIIL I AlI�l�u 11 Il.I IIII IIi I II�IId,�I (YIII II IIIIIII I Y I.I II I -III uI,IIIII III III YIIILI IIIII II YI II IIIIIIiY 'YII 'I �IULI,IIIYI � '� �� I I � Illlu el I I ,� I1. IIIIIIIIIL' I IYaIIYIYIIIY IJIIIIeeI 1.4 �IIJ'Y� tlI I�u.Y61 , IYnuIiIY it LIT.. IYIu��4'mlJll' Ytl ilhlulll III 11.11I1IIL.Y IYiIIY ❑IIunI Iliilii,111I.I'Y YFINOYII IY.III IIIIIII I'lYe�ltllm LY IIII�IJWJIIYV IL �JL�II All eLliJll 1Y IiIIL II ILILtlYIII II. xlnlllll Y I'.111YIiI141 II nlWUIII I Fax (916) 783-5003 , PLAN 3
<br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVAL RECOMMENDED( Y W dII�YII DATE SCAL.EIILIIIIIII a. I � W I I IIIm IeL I I I ��
<br />dr"mmU www.mroengineers.com ,r} C����, �,�Q z
<br />B. GREEN 1/06/06 D. PECCHIA 1/06/06 M. KANi NAN 1/06/06 = /.fym ENGINEERING - PLANNING - SURVEYING �lF� ` C6 22 9
<br />_.GC / D
<br />_ � � I � ill� � .. �� � � � � � � � � � I I � � � I � dl ld 11 II I. I ml�Id'm II e�I 111 dluW nul NLm 111WIIIV IIIeI�Yieulllra�Il uull ll oIl Im uw �I uYl �Il lutel Yau 611o11 elitl uAl 11 u111I II II UW Ile � mJuuPll it Y�p111Y6 du liY
<br />'\/^'.J I�� �n�II �� ��I�I a II Imp I ��lul IIIIII IJdI IIII II ulI11�IJ IIIII II IIIIII III IIII,�I iilY ll IIII IIIIII ��I m61��e I��dIIII�1.11�, Y�III,IY dIYII ImLIIIYIIIYI�YIIIU IIIII IIII1111111 �Il�u III III •n ll IIu.1��II1111II1111 I���IIIIIII IIYI IIIIIIIJLIIwI II�II�II�uIII LILY �11141IeIIIeIY�Y JJ UJIIIII TIE Iulllll.IIIII KIWI IIII III. YIII II I I I� ` ,�11 .I�I�YIILIIIIIIIIIIIIYIIIIII6I IIIII .I u�IY �i �Idlul ��,InY IIIIII IIIII IIItlaII��IIIII JImIIII I,d �nId�IY.I. AlI�IYuI IILUYII eI IIII III�IwIIIul11I IIIIII ��JI WIIIIIIIIII IIIIIIIIiI II III IIIII tlI IW. 1YI� II �.YI J��iIYI IIII IIII ,Ia YYLII IIII JIIIIIIIIN II IIIII II�W II II .I I IIiY� I I
<br />
|