Laserfiche WebLink
IV <br />Center between <br />girders. <br />3/B" Inserts (4 req d) <br />Deck slob � Sea Note /. <br />4. <br />conduit `Conduit strops. <br />/P4" mo/%ob/e Iron high Pu/l box (See <br />collor floor flonge. defoil of rrght) <br />Weld or bolt to box. IX <br />- Extend conduit 3/4 <br />104""conduit n/pp/e —� through f/onge into <br />box. Term/note with <br />Plumbing device insu/oted bushing. <br />/y411condult, length Lum/no/re. <br />os required. <br />Even with bottom <br />of girder <br />When bo/ios t s to be Ins tolled to pull Do.r, <br />box shot/ be of sufficient size and design <br />f as opproved by the Engineer <br />CD <br />Drill for 3/6"codm/um p/oted bross <br />6 "j / Inoch/ne screws (4 regAd.) <br />/ 1 / Weld to box. <br />o CD / . / B "ir 8 "x B "box /D go sheet steel. <br />Drill and top s/des and bottom <br />for //4 -20 cover screws. Provide <br />x /" /ago. ro/nforcomenl inside box. <br />— Drill hole to c/eor 1 r4" conduit <br />Cover, /0 go. sheet steel, 3/4 "f/onges, sides <br />/ and bottom. Weld corners of bottom. Secure <br />to box wi fh 3 - //4 " 20 x //2 " cadmium p/o fed <br />bross or stoin/ess steel mochine screws. <br />Notes / Cost-InAplace malleable Aron wedge inserts <br />or self' -drilling expansion stee/ anchor <br />2. Go/vonire box and cover offer fobricof/on <br />3. Provide one / j�"knock - out 6 "up on eoch <br />side and bock. Pound f/Of offer punching. <br />4 For future insto/lot/on, omit suspension conduit <br />and /uminoire, closed f/onge with go/v. plug. <br />5 See note 4, Deto/l "F"be/ow <br />I_ <br />W <br />W <br />0 <br />to <br />60 <br />90 <br />DETAIL "P" <br />PENDANT SOFFIT LUMINAIRE <br />Scole: I" a I'- O" <br />W <br />U <br />z <br />� 30 <br />0 <br />W <br />0.8 <br />0.4 i <br />0.2 <br />0.� <br />60 30 0 30 60 <br />DISTANCE IN FEET <br />ISOLUX DIAGRAM (MINIMUM F.C.) <br />7000 LUMEN (ASA H39- 22 KB) <br />MERCURY VAPOR LAMP <br />17' MOUNTING HEIGHT <br />Scale. I" =40' <br />60 <br />90 60 30 0 30 60 <br />DISTANCE IN FEET <br />ISOLUX DIAGRAM (MINIMUM F. C.) <br />0 <br />O 7000 LUMEN (ASA H39-22KB) <br />MERCURY VAPOR LAMP <br />17' MOUNTING HEIGHT <br />Integra/ ballast Scole. I" = 40' <br />Mounting brocket Conduit hub, install plug or <br />Lomp and socket per„,,,, reducer and conduit, os regd. <br />Specio/ prov/s/onS Terminal blocks <br />Reinforcing steel, see • <br />�. .. .• y_, 14 <br />sheet titled "SJandord <br />• , / Defoi/s No /, Box <br />�:. : -- - C o . •. Girder . <br />Anchor ring <br />Face of concrete where <br />Refractor and frome structure is not hor/ronfo/ <br />ossemb/y. SECTION / / slope <br />Notes . /. P/oce //4"plywood d1sk In body opening during pouring. <br />2 Insfoll /uminoire with ox/s vertico/ and "street side "of refractor oriented os <br />Indicoted on /ighl/ng layout. <br />3 Lum/no/re sho/l De /ocoted so os to provide minimum c/eoronce of 2 ft from inside <br />surfoce of girders and / ft from near foce of diaphragm. <br />. <br />DETAIL "F" <br />FLUSH SOFFIT LUMINAIRE <br />Score: 3/32"= I" <br />m <br />90 <br />45 30 <br />/ /0'/ <br />15 — <br />30 <br />43 <br />Coupling to be set flush <br />w/ th foce of concrete <br />be/ow roodwoy surface. <br />Coupling Go/vonijed plug <br />Conduit /ubricole <br />' /brood <br />with <br />groph/liled <br />grease. <br />� 1 <br />• • • • ' L Mork with 3 <br />C/amp high "Y a" obove <br />• ' conduit <br />(Copper bonding strop. Instal/ only d structure <br />construction joint, extend at /east 6 "from <br />foce of concrete. <br />DETAIL "C" <br />CONDUIT TERMINATION <br />No Scole <br />. ' Box girder <br />Conduil 4 <br />union. ' ' Neoprene sleeve <br />�-- — exponsion- deflection <br />•. fifling, walerproof <br />Form 6"d10 �- <br />pocket • "Z— 3 "•mIn <br />Column or abutment. <br />Notes I Filling and pocket required only where movement <br />con occur between g9irder and column or obutment <br />2. Fill pocket oround filling with resilient wo/erproof <br />compound. <br />CONDUIT RISER CONNECTION <br />AT COLUMN OR ABUTMENT <br />1 DISTANCOE IN FEE 15 30 45 No Scole <br />5 <br />.J <br />0.5 <br />r 0.2 <br />0.1 � <br />ISOLUX DIAGRAM (MINIMUM F. C.) <br />12000 LUMEN (H37 - 5KB) <br />MERCURY VAPOR LAMP <br />15' MOUNTING HEIGHT <br />Scale: I" z 2O' <br />BALLAST 81/ „+ <br />- <br />3 mounting bolts <br />•.0 <br />2 <br />__. 2 <br />5/16" dIa. and <br />self -drilling <br />steel inserts. <br />; ." '• <br />_ - <br />-,- -I- +I <br />Ili _- <br />-Slow <br />conduit box <br />- <br />I <br />• <br />•• a � <br />16.E ±1» <br />DETAIL "W" <br />WALL <br />LUMINAIRE <br />Not <br />to Scale <br />Structure expansion joint <br />Pocking <br />Conduit expansion 11tt/ng <br />Conduit <br />Rigid meto/ conduit <br />N <br />'*--1*6 go. copper bonding strop. P/oce <br />Bond strop p g loop —�- loop 0 oinsi concrete first poured. <br />NOTES <br />/ Except for s/dewo/k joints, o conduit expons/on fitting shot/be <br />AnsfalAed of eoch //2- Inch or greoter structure joint, hinge or obutment. <br />2 Expons/on fitting shot/ be /nstolled porol/e/ to superstructure girders. <br />3 Where /otero/ movement greoter thon //4 -Inch moy occur, insfol/ <br />neoprew sleeve exponsion - deflection f/If/nq strodd/ing joint <br />DETAIL "X" <br />CONDUIT EXPANSION JOINT <br />No Score <br />- Pu // box 1/ 11 <br />. II <br />Column orb" ' <br />—Rig/d A�1elol I.. Conduil riser. <br />vwvwl_ <br />Concrete or nduif Co . <br />— <br />Steel Doom �' '4`6go bonding strop ., <br />L: <br />Combinotion I' / / min' <br />Sfructure coupling ���'i/�`y' `��+// '�. , �``� ► '�`��''�/�� ,. <br />DII -- Defo/l <br />eorinC <br />g ii Fool/ng. <br />_i Bent <br />CONDUIT RISER CONNECTION <br />No Scole <br />LOWER END OF CONDUIT RISER <br />AT COLUMN OR ABUTMENT <br />No Scole <br />Conduit poss/ng through girder Condu/f support, notched precost <br />of diophrogm of box girder concrete block set In lower slob. <br />section shall be either cost into P/oce of /nfervo/s of 6'mox/mum <br />concrete or passed through <br />opening. Opening shall not Ds d : Flush soffit /uminoire or <br />drainage opening and shall be <br />Only as large as required to C coil/n� put/ box. See Details <br />• � .E K . <br />install conduif. Conduit shot/ be F and <br />N <br />run either porolle/ or of right ong/es N <br />to girders. �= - = �►�- ► - - - - - - ' <br />,Stem Or diaphragm <br />After plumbing slondord, <br />grout all oround bolts. <br />Finish with 45's/Ope. <br />Provide 3/4"droin hole <br />OI low point. <br />O <br />:F <br />+I <br />Slondord. <br />CONDUIT INSTALLATION IN. <br />BOX GIRDER SECTIONS <br />No Scole <br />t Top of finished <br />1 I deck, roil, or s/dewo/ <br />Loove void. <br />DETAIL "N" <br />GROUTING AT ELECTROLI ER <br />No Score <br />k. <br />State of California <br />THE RECLAMATION BOARD <br />COUNT Y or TA Al JOAQ(11A1 <br />61/.d Tl RLOo POdD .5,e/o4st .4xw 4 RP ea a c iv&.v d T <br />.J�TOC,rTON I�ivE�PT/�tlG G'D.v.OL <br />ELECTRICAL DETAILS "2 v <br />AS BUILT PLANS � <br />PREPARED: DATE: APPROVED: AX.`7S7 C� <br />0 <br />Constr. Eng'r. = SUleolBMIT ED: Q E. IZZS7 owzeax v1TCNC , /xtr. cw�rBs'ENs►,� <br />e SHEET <br />✓. C. ✓0A',V 0A1. Ar.AOC. XA1&e WR. TR. e- 996 <br />REVISION DATE DESCRIPTION eT APP D _ RECOMMENDED: R.E. 49J99 OF I� ' <br />COMP BK FIELD YK C Oi E FILE SCALEoolo MAP <br />c roa/ i Al�o�vsY/? f,vc,.aQ / 7 `� y <br />STATE iVO.29C-057 <br />