Laserfiche WebLink
Printed on:Thursday 12/14/2023 07:52 AM 29C0067/AAAO/120251Pageof1 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />7 <br /> Routine-Roadway View (12/11/2023) Routine-Elevation View (12/11/2023) <br /> Routine-Underside View (12/11/2023) Routine-Map View (08/11/2021) <br />PHOTOGRAPH IDENTIFICATION <br />0.8 MI S OF 8 MILE RDLOCATION <br />TEAM LEADER Kristina J. Shurbert <br />FACILITY CARRIED 99 FRONTAGE RD E <br />No. <br />REPORT AUTHOR Kristina J. Shurbert <br />FEATURE INTERSECTED MOSHER SLOUGH <br />BRIDGE LOCATION INFORMATION <br /> 38°02'34"LATITUDE <br />Kristina J. Shurbert (Registered Civil Engineer) <br />INSPECTED BY KJ.Shurbert/M.Molina Bed <br />N N/A (NBI)CULVERT <br />7 GOODDECK <br />7 GOODSUBSTRUCTURE <br />7 GOODSUPERSTRUCTURE 98.0SUFFICIENCY RATING <br />STRUCTURALLY DEFICIENT (SD) STATUS NOT SD <br /> 381 <br />PAINT CONDITION N/A <br />STRUCTURAL HEALTH CONDITION SUMMARY INFORMATION <br />7 ABOVE MIN CRITERIASTRUCTURE EVALUATION <br />121°15'28.84"LONGITUDE <br />5 STABLE W/IN FOOTING OR PILSCOUR <br />INVENTORY RTE(ON/UNDER)140000000ON <br />POSTMILE 0 <br />ON NATIONAL HIGHWAY SYSTEM NOT ON NHS <br />(9) <br />(11) <br />(16) <br />(17) <br />(7) <br />(6) <br />(5) <br />(104) <br />(58) <br />(59) <br />(60) <br />(62) <br />(67) (113) <br />Routine Inspection <br />BRIDGE INSPECTION REPORT <br />Kristina J. <br />Shurbert <br />12/31/2025 <br />CIVIL <br />47440 <br />12/14/2023 <br />Date <br />Exp. <br />BRIDGE NO.: <br />29C0067 <br />STRUCTURE NAME: <br />MOSHER SLOUGH December 11, 2023 <br />INSPECTION DATE: <br />DECK AREA (M) 2