Laserfiche WebLink
x <br />x <br />x <br />El <br />r*i <br />(Z <br />DESIGN OVERSIGHT <br />Lf ) SIGN OFF DATE <br />C) <br />CIO <br />FORM DC-OE-92-PF (REV. 3/88) <br />� Abut / -� <br />i <br />Iti <br />9-T <br />-2 OJ <br />V) <br />�1< <br />Iz) <br />E'Z <br />�0 N <br />Ln <br />*9 <br />xSee "Abutment / <br />Detolls No.1" sheet <br />D RAWING <br />'�i wo fi< <br />*/0 tot 2 each s1de <br />COUNTY OF SAN JOAQUIN - DEPARTMENT OF PUBLIC WORKS DESIGN <br />Senlor Englneer Data ApDr oval Recommended Bv Date DETAILS <br />FILE NAME DRAWER I SHEET NO. QUANTITIES <br />BY <br />J. MA <br />BY <br />E. MAECHLER <br />BY <br />J. MA <br />q- Bent 2 <br />See "LongltudInGI ReInforcement DetGll,5 No. /" sheet for typ1cG1 reInforcement detalls not shown <br />DIST COUNTY ROUTE <br />10 Si <br />—Aom <br />REGISTERED CIVIL ENGINEER <br />POST WILES <br />TOTAL PROJECT <br />10 V 1 5 19.41 <br />PLANS APPROVAL DATE <br />IMSEN & ASSOCIATES, INC. <br />9833 Horn Rocd, Sulte C <br />Sccr-cmento, Callfornlc 95827 <br />SHEET TOTAL <br />NO. SHEETS <br />41 105 <br />ENN I S D. PECCH I <br />No. 32049 <br />Exp. 12/31/96 <br />CIVIL <br />OF CN <br />Bent 4 <br />Match 6' spacIng <br />GlonG Bent 3 <br />/5/0" <br />*/0 cont <br />tot 2 each s1de <br />Typ1cG1 ReInforcement <br />------------------------------------------------------------------ <br />---------------------------- <br />------------------------------------------------- <br />CHECKED <br />G D I N I <br />CHECKED <br />J M A <br />CHECKED <br />C. F. YANG <br />ORIGINAL SCALE IN INCHES <br />FOR REDUCED PLANS <br />fT - )ABtff BEtff4 <br />PREPARED FOR THE DENNIS D. PECCHIA <br />COUNTY OF SAN JOAQUIN PROJECT ENGINEER <br />DEPARTMENT OF PUBLIC WORKS <br />I I I I I I I CLJ <br />0 1 2 3 EA <br />1� <br />*/0 cont tot 2 each s1de <br />APPROACH SPANS <br />BRIDGE NO. BACON ISLAND BRIDGE <br />29C- 108 <br />POST MILE LONG I TUD I NAL RE I NFORCEMENT DETA I LS NOv 3 <br />DISREGARD PRINTS BEARING REVISION DATES (PRELIVINARY STAGE ONLY) I SHEET OF <br />EARLIER REVISION DATES 03-,� 08 6�2� 10-22 S24 S416 <br />1,--'92 1,49�21,,--"9� 1 -93 <br />/5 (Z -ED G� r�- <br />