Laserfiche WebLink
Printed on:Tuesday 11/28/2023 08:58 AM 29C0109/AAAQ/114943Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Appr Roadway-Repair <br />09/19/2023 <br />Str Target ROUTINE <br />Replace approach AC at both abutments as part of the polyester concrete overlay work to provide transition from the roadway to the <br />bridge deck. <br />Dist Target <br />EA Status PROPOSED <br />Photo 2 <br />Elevation (UAS, right side) <br />Photo 3 <br />Underside (UAS, from Span 2 left side looking east) <br />Photo 5 <br />Approach AC Condition (Abutment 1) <br />Photo 6 <br />Approach AC Condition (Abutment 4) <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Place Overlay <br />09/19/2023 <br />Str Target ROUTINE <br />Place one inch polyester concrete overlay on the bridge deck. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS