Laserfiche WebLink
Printed on:Tuesday 05/28/2024 04:01 PM 29C0114/AAAX/128904Pageof1 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />12 <br /> Routine-Roadway View (01/12/2018) Routine-Elevation View (01/12/2018) <br /> Routine-Underside View (01/12/2018) Routine-Map View (05/28/2024) <br />PHOTOGRAPH IDENTIFICATION <br />W OF RIO BLANCO RDLOCATION <br />TEAM LEADER Pamela Gagnier <br />FACILITY CARRIED EIGHT MILE ROAD <br />No. <br />REPORT AUTHOR David Bonar <br />FEATURE INTERSECTED BISHOP CANAL <br />BRIDGE LOCATION INFORMATION <br /> 38°03'29.95"LATITUDE <br />Anthony Fernandes (Registered Civil Engineer) <br />INSPECTED BY D.Bonar/P.Gagnier <br />N N/A (NBI)CULVERT <br />7 GOODDECK <br />7 GOODSUBSTRUCTURE <br />5 FAIRSUPERSTRUCTURE 67.3SUFFICIENCY RATING <br />STRUCTURALLY DEFICIENT (SD) STATUS NOT SD <br /> 1,138 <br />PAINT CONDITION N/A <br />STRUCTURAL HEALTH CONDITION SUMMARY INFORMATION <br />5 ABOVE MIN TOLERABLESTRUCTURE EVALUATION <br />121°25'08.38"LONGITUDE <br />5 STABLE W/IN FOOTING OR PILSCOUR <br />INVENTORY RTE(ON/UNDER)140000000ON <br />POSTMILE 0 <br />ON NATIONAL HIGHWAY SYSTEM NOT ON NHS <br />(9) <br />(11) <br />(16) <br />(17) <br />(7) <br />(6) <br />(5) <br />(104) <br />(58) <br />(59) <br />(60) <br />(62) <br />(67) (113) <br />Routine Inspection <br />BRIDGE INSPECTION REPORT <br />Anthony <br />Fernandes <br />06/30/2024 <br />CIVIL <br />60501 <br />5/28/2024 <br />Date <br />Exp. <br />BRIDGE NO.: <br />29C0114 <br />STRUCTURE NAME: <br />BISHOP CANAL January 11, 2024 <br />INSPECTION DATE: <br />DECK AREA (M) 2