Laserfiche WebLink
Printed on:Friday 05/24/2024 10:25 AM 29C0116/AAAP/128923Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />Photo 6 <br />Measured horizonal unsupported legth of slope protection at <br />Abutment 8 <br />Photo 7 <br />Measured seperation of slope protection from Abutment 8 Face <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Remove Debris <br />01/08/2024 <br />Str Target ROUTINE <br />Remove the 2 cubic yards of loose debris on the left side of Abutment 1 <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Scour-Place Counterm <br />01/28/2004 <br />Str Target ROUTINE <br />Provide scour protection at the embankment slope at Abutment 8 in accordance with the guidelines in the current version of HEC-23 " <br />Bridge Scour and Stream Instability Countermeasures." <br />Dist Target <br />EA Status PROPOSED <br />Photo 8 <br />Debris on the left side of Abutment 1 <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS