My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-29C-116
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-116
>
2024-29C-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 8:50:02 AM
Creation date
5/30/2025 8:49:37 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-116
Type - Bridge Supporting Doc
Inspection
Name
Beaver Slough - Blossom Road
Text box
ID:
1
Creator:
Created:
5/30/2025 8:50 AM
Modified:
5/30/2025 8:50 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/DBONAR/2024_01_08_10-45-24_IMG_0139.JPG
ID:
2
Creator:
Created:
5/30/2025 8:50 AM
Modified:
5/30/2025 8:50 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/DBONAR/2024_01_08_10-46-55_IMG_0141.JPG
ID:
3
Creator:
Created:
5/30/2025 8:50 AM
Modified:
5/30/2025 8:50 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/DBONAR/2024_05_05_09-14-37_IMG_0130.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Friday 05/24/2024 10:25 AM 29C0116/AAAP/128923Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />Photo 6 <br />Measured horizonal unsupported legth of slope protection at <br />Abutment 8 <br />Photo 7 <br />Measured seperation of slope protection from Abutment 8 Face <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Remove Debris <br />01/08/2024 <br />Str Target ROUTINE <br />Remove the 2 cubic yards of loose debris on the left side of Abutment 1 <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Scour-Place Counterm <br />01/28/2004 <br />Str Target ROUTINE <br />Provide scour protection at the embankment slope at Abutment 8 in accordance with the guidelines in the current version of HEC-23 " <br />Bridge Scour and Stream Instability Countermeasures." <br />Dist Target <br />EA Status PROPOSED <br />Photo 8 <br />Debris on the left side of Abutment 1 <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS
The URL can be used to link to this page
Your browser does not support the video tag.