Laserfiche WebLink
'-o" Rcu('jwcv 2,-4" <br />Perm - 2'_ 2o, <br />Canal <br />/0 -0 <br />A_/ Slope In /0'0" <br />5 'o L3 p rrT,, <br />Pier 2 <br />�0 <br />1 Abutment <br />F Atutment I 4-pl,er <br />C <br />I if <br />`; ►�- __4 5f -16-0 /6 0 f6' 0" 16' f 416- <br />$7 <br />< 8"Berm C\j <br />oln-, <br />Dr <br />n rl- ri - <br />M r_1 <br />�8'4 Berm <br />r - - - - d, <br />F <br />A K <br />Bottom of curb P_ <br />-7 -7 <br />of - - - - - - <br />r <br />---------------- 1 5 If <br />7 7 <br />35 3 4 T <br />.9y 9 <br />8 <br />Z: .9 7 <br />_j L L <br />-7 <br />L <br />B ge and A <br />--Poving tch buffer <br />Cr RoUdwi Gy -7 <br />r <br />H H <br />1---Backwc11 ion L - 1052 -t- 30.00 N F/_ 193.96 - / ---stot 'El. 1059 4 4 <br />_j L L_ 7-- El. 193.9 <br />B <br />4� SECTION 8 <br />4 <br />Bridge <br />-El. 193, 96 <br />T <br />T TT7 <br />_T-IF UT <br />T1 <br />A <br />_j <br />El. 179.63 <br />SECTION C- C <br />o Paving notch bvffer-_,9 qw 70'08 , 1 -. I --Diaphragm ,7 1 <br />- <br />------- Dio hrcGm ---------- <br />_j Bockwoll E <br />-Drain----------- X 0'- of <br />P <br />8 x 24" st *c filler <br />Eockwc// W. dowels <br />Elastic <br />LT�� ----u U U J_ U_ _U_ U - - - - lfu _U_ U W Plate coded wif�, asphalt <br />7 <br />6-0 <br />6-0--->-i F F + <br />Metal guordrGil and posts <br />J C cli -_ __. <br />A v, Z%o A _y_ <br />C,j - % d <br />11 3 - - - - _-_2' - Chomfer <br />4 <br />x - x 0-// , . , r il,. <br />3 <br />3'Elosolic filler-­­`1 L e(id <br />PLAN 4- /3" pi-o <br />;i > 4 3 311 <br />-W Elastic filler-, �11 5'�> 2 <br />T : • <br />0 1 5 to -3 <br />OF 2 4 �'Elastic filler SCALE FEET <br />8 <br />V 6.4 x 0'-//" <br />8 18 <br />--EIGStIC filler <br />1. <br />w.1. Plate IT <br />/ <br />1 "I'h G In Fe r >I -4 ---111 t <br />Elastic filler <br />G <br />1241-1011 7 7 G C'. <br />.T <br />3" 118- 9"--- <br />Panels (0 6' <br />I let of <br />�7, <br />-0- x x o'-Ni" <br />8 opf <br />Metal roiling and posts -,, . I I I <br />I* . Lead plate ;7 <br />'Slope top of concrete .0. <br />I F <br />2­ <br />-<JE <br />0 <br />I I I - E <br />SECTION E <br />SCALE of FEET <br />SECTION D, j <br />W.S.- 24 Min. <br />TT T <br />Bottom. of metal post to <br />COLUMN BEARING DETAILS <br />be encased j�7 concrete' <br />Li <br />1,L H iL IL <br />--j <br />r <br />Bearing 9" <br />El. 179 6.3--- <br />­E1. 179-63 <br />'ABUTMENT I -ABUTMENT 2 ESTIMATED QUANTITIES <br />r 'Elastic filler Ground piers - - Abutment <br />Ox 15 of W. T bars, -1 . - I - <br />2 70 Cu. Yds. <br />IL <br />/1-<;P �__ <br />V. r,/\ <br />y <br />ABUTMENT <br />N1 . <br />W te Reinforcement steel -------------- 46 000 Lbs. <br />tack weld to plate 6' <br />El. 173.02 2' W1. bar <br />Miscellaneous metalwork- 8 900 L bs. <br />J- weld to x 15" 5Grs <br />Plates some as shown <br />in Sec. G-G-B <br />- <br />ecm <br />El 169,44--- <br />PIER I PIER 2 El. 16:9.44 <br />NOTES <br />7008, Design based on H-15-44 loading, in cccordonce w'th 0' <br />ELEVATION A -A <br />Test hole <br />'Standard Specifications for Highway Bridges" The <br />LOG OF TEST HOLES American Association of State Highway Officials <br />No. Test hole <br />Test hole No. 1 1944 -Edition <br />No. 2 <br />El. 1186.4 to 1854 Sandy clay loom Concrete design based on G compressive strength of <br />SECTION F-F <br />El. in accordance with the "joint Committee <br />3 185.4 to 180.4 Clay, slight fine sand 3 000 p <br />Columns and <br />3 <br />Canal <br />P 11 . , , i . El /804 to 178-9 Flne SGI7d,s/ight cloy Specificotions for Concrete and Reinforced Concrete" <br />I - , f Bearing-- <br />C beams, Abut. El, 178.9 to 169-.4 CIGy, s/Ight fine sand June 1940. <br />_y_v 3 -Icy and free sand <br />El. 169.4 to 164.4 <br />I a Abutment and pier footings-. to be placed on undisturbed <br />4 4 <br />- " I - 4 4 <br />_��3`, 3 t-f- Si,,ght CIGy <br />4 4 El. 164.4 to 161. 9- Fine sand, firm foundation. <br />;nlq <br />'Zs � I - pressure Ory Ole Footing desIGned for a sol I of 2 tons per sq. ft. <br />X <br />e approximate v f footings or ate only. <br />% 10 <br />D. 183.9 to 182 9 Sandy cloy loom -DWg. 214 -©-I 4606. <br />-Station L - 1052 1- 30-00 For Setion 11-H see <br />Test hole No. .2: ElevGt' ns at bottoms a <br />Bridge Beam, <br />to 176. 9 Cloy, slight fine SGnd <br />co v El. 182.9 <br />A <br />A A -IN <br />t 1 1 A� I ft 176.9 to '171. 9 Cloy and fine sand, STATE NO. 29C-120 <br />4111r + - ___ - If N - 1 -1 % 11 <br />A, <br />0 y 70 8' ­_ - lnl,* El 171.9 to 169.9 Fine sand slight cloy <br />70'08' 1 1. -l", I _1� - , - N UNITED S T4 TES <br />Q) 1 1 , . 70*08',- .0 -t El. 169.9 to 166.9 Claysly ght fine sand DEPARTMENT OF THE INTERIOR <br />4 <br />% 70008'_ El. 166.9 to 162.4 Fine sand, slight clay 190F?rAU OF RECLAMATION <br />'I ir CENTRAL VALLEY PROJECT-CALIFORNIA <br />El. 162.4 to 1579 Clay, slight- fine sond <br />4 1$ go, <br />J_ k,• 9 DELTA -MENDOTA CANAL <br />4 CA <br />Holes in plates <br />STA. L-1052'* 30. 00 <br />;.->j <br />f tc P. 181#--' 1 <br />V <br />Pier 2- ----- COUNTY HIGHWAY BRIDGE <br />tr Pier I - - - 1 , -1 . I <br />SECTION G-G <br />Abutment -ELEVATION- SECTIONS <br />_4 <br />abutment 1-- j i 1`<--7------21 2 ---------- 21 7 PLAN N 5 <br />------------- ---------------------- ----3 -DRA WN ------ J - Ws u a m t 7 r E D YU <br />C\j TRACED---- --- - <br />- - - - - - - - - - - - - - - - -------------------------- L R 6 <br />//?1- 10 -RECOMMENDED- <br />-CHEI _APPROVED- 5a,&ke, <br />CHIEF EN 17vEe,9 <br />FOOTING .'PL A N <br />W ENVER,COLORADO, AUG. 20, 1947 <br />Q: SHEET I OF 2 d214-0-14605 <br />FILE NAME L),�AWER <br />CORD CIRAWiNG <br />Ae- X/0. /077 av �,twiele-ti,+1v ep e, z>e4.rA X,,"6--rv,001A cA, vAe, <br />