Laserfiche WebLink
Printed on:Thursday 10/03/2024 11:12 AM 29C0120/AAAR/136928Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Place Overlay <br />06/26/2018 <br />Str Target ROUTINE <br />Remove the AC overlay and place a 2 inch thick polyester concrete overlay on the bridge deck. During removal operations, chain the <br />deck and patch any unsound areas. <br />Dist Target <br />EA Status PROPOSED <br />225 Pile-Steel 2 1 ea. 1 0 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)5 <br />WORK RECOMMENDATIONS <br />(215) Abutment-RC <br />(225) Pile-Steel <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There were no significant defects noted. <br />This quantity includes monolithic wingwalls at both abutments. <br />The pile element is included to indicate the presence of piles on this structure. The piles were not exposed for visual inspection. No <br />indication of pile distress was noted in any substructure element.