Laserfiche WebLink
Printed on:Sunday 03/03/2024 07:24 AM 29C0129/AAAN/122389Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Remove Debris <br />01/24/2020 <br />Str Target ROUTINE <br />Remove drift/debris build up under the bridge (approximately 50 cubic yards). <br />Dist Target <br />EA Status PROPOSED <br />Photo 5 <br />Drift/Debris (Bent 6) <br />Photo 6 <br />Drift/Debris (Bent 15) <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Deck-Methacrylate <br />Deck-Patch spalls <br />01/03/2024 <br />01/03/2024 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Treat the bridge deck with methacrylate. <br />Repair the spalled/delaminated slab at Bent 8 right side. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />WORK RECOMMENDATIONS