My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-29C-137
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-137
>
2023-29C-137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 12:50:12 PM
Creation date
5/30/2025 12:49:57 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-137
Type - Bridge Supporting Doc
Inspection
Name
Pixley Slough - Lower Sacramento Road
Text box
ID:
1
Creator:
Created:
5/30/2025 12:50 PM
Modified:
5/30/2025 12:50 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2023_09_19_10-02-28_IMG_2509_RESIZE.JPG
ID:
2
Creator:
Created:
5/30/2025 12:50 PM
Modified:
5/30/2025 12:50 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2023_11_12_12-18-41_HYIF0540_RESIZE.JPG
ID:
3
Creator:
Created:
5/30/2025 12:50 PM
Modified:
5/30/2025 12:50 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2023_11_12_12-18-39_HWWP5029_RESIZE.JPG
ID:
4
Creator:
Created:
5/30/2025 12:50 PM
Modified:
5/30/2025 12:50 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2023_11_12_12-18-38_FBVK9674CROP_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Tuesday 11/28/2023 08:58 AM 29C0137/AAAN/114943Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />6 <br />Photo 7 <br />Pier Wall Spall (UAS, Pier 2 left side) <br />Photo 8 <br />Pier Wall Abrasion (Pier 2 Span 2 side) <br />SUBSTRUCTURE PHOTOGRAPHS <br />Photo 2 <br />Elevation (UAS, left side) <br />Photo 3 <br />Underside (UAS, Span 1 from left side) <br />OTHER PHOTOGRAPHS <br />210 <br />215 <br />Pier Wall-RC <br />Delamination/Spall/Patched Area <br />Abrasion (PS Conc./RC) <br />Abutment-RC <br />2 <br />2 <br />2 <br />2 <br />12 <br />1 <br />9 <br />32 <br />m <br />each <br />each <br />m <br /> 2 <br /> 0 <br /> 0 <br /> 32 <br /> 9 <br /> 0 <br /> 9 <br /> 0 <br /> 1 <br /> 1 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />1080 <br />1190 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)(6) <br />(210) Pier Wall-RC <br />(210-1080) Delamination/Spall/Patched Area <br />(210-1190) Abrasion (PS Conc./RC) <br />(215) Abutment-RC <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There are spalls along the top of Pier 2 that do not warrant a defect at this time. <br />There is a one foot by eight inch by two inch deep spall without exposed rebar at the top left side of Pier 2. There is a one foot by six <br />inch by three inch deep spall with exposed rusted rebar toward the bottom left side of Pier 2. See Photo 7. <br />There is up to three feet of abrasion with exposed secure coarse aggregate along both sides of Pier 2 original structure (see Photo <br />8). <br />There were no significant defects noted.
The URL can be used to link to this page
Your browser does not support the video tag.