Laserfiche WebLink
Printed on:Friday 02/14/2025 11:39 AM 29C0168/AAAO/148017Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />Photo 1 <br />Marked crack at Abutment 1 on the left abutment/deck interface <br />Photo 4 <br />Marked crack at Abutment 4 on the right abutment/deck <br />interface <br />Photo 5 <br />Heavy vegetation growth on both sides of bridge. Left side <br />shown as seen from Abutment 1 <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Epoxy Inject <br />11/08/2018 <br />Str Target ROUTINE <br />Epoxy inject the cracks at the corners of the slab, at the slab/abutment interface. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Remove Vegetation <br />Provide Inspection A <br />11/06/2024 <br />11/03/2020 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Remove vegetation growing on both sides of the structure. <br />Remove the heavy silt buildup and provide inspection access below the structure. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS