My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-29C-180
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-180
>
2024-29C-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 9:33:27 AM
Creation date
6/2/2025 9:32:40 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-180
Type - Bridge Supporting Doc
Inspection
Name
Corral Hollow Creek - Corral Hollow Road
Text box
ID:
1
Creator:
Created:
6/2/2025 9:33 AM
Modified:
6/2/2025 9:33 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2024_06_25_14-27-36_IMG_3606_RESIZE.JPG
ID:
2
Creator:
Created:
6/2/2025 9:33 AM
Modified:
6/2/2025 9:33 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2024_06_25_14-27-32_IMG_3605_RESIZE.JPG
ID:
3
Creator:
Created:
6/2/2025 9:33 AM
Modified:
6/2/2025 9:33 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2024_06_25_14-21-28_IMG_3600_RESIZE.JPG
ID:
4
Creator:
Created:
6/2/2025 9:33 AM
Modified:
6/2/2025 9:33 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2024_06_25_14-16-51_IMG_3596_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Thursday 10/03/2024 11:46 AM 29C0180/AAAM/136926Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />7 <br />Photo 3 <br />Spall in the left wingwall at Abutment 5 <br />Photo 4 <br />Diagonal cracks in the left wingwall at Abutment 5 <br />Photo 5 <br />Typical sediment build-up in the cells. Cell 4 shown <br />Photo 6 <br />Typical scaling in the faces of the supports. Pier 3 Cell 3 shown <br />SUBSTRUCTURE PHOTOGRAPHS <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br />SUBSTRUCTURE <br />(62) CULVERT RATING = 6 <br />(241) Culvert-RC <br />(241-1080) Delamination/Spall/Patched Area <br />(241-1120) Efflorescence/Rust Staining <br />(241-1130) Cracking (RC and Other) <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />previously reported and no significant changes were noted. <br />The previously reported exposed downstream invert at Pier 3 has aggraded. <br />The bottom 12 inches of the abutments and Piers 2 and 3 have light scaling for the full width of the culvert. In a few places, this <br />condition has progressed to large, shallow spalls, exposing the large aggregate. The aggregate appears sound. (See Photo 5). There <br />is an outstanding work recommendation to clean the sediment out of the spans and test the soil for corrosive conditions. <br />There is heavy efflorescence build up in the bottom half of Abutments 1, 5 and Pier 3 along the soil line. (See Photos 7 and 8). This <br />condition has been previously reported and Abutment 1 and Pier 3 were added. <br />There is a full-height vertical crack up to 0.13 inches wide with edge spalling in the left side of Abutment 5. Extending from this crack <br />are full width discontinuous horizontal cracks up to 0.02 inches wide and spaced at 4 feet apart into Abutment 5. (See Photo 9). This <br />condition has been previously reported and no significant changes were noted. <br />The abutments and Pier Walls 2, 3 and 4 have full height vertical cracks up to 0.02 inches wide and spaced as close as 4 feet on <br />center. (See Photo 10). This condition has been previously reported and no significant changes were noted.
The URL can be used to link to this page
Your browser does not support the video tag.