Laserfiche WebLink
Page 2 of 4 <br />INSPECTION COMMENTARY <br />request (#8143) was sent to Caltrans Specialty Access to assess this bridge and provide <br />an access plan. <br />SAFE LOAD CAPACITY <br />A Load Rating Summary Sheet <br />dated 01/17/2019 is on file for <br />this <br />structure. The current <br />rating has been assigned in <br />accordance with SMI procedures, <br />while this report does not <br />include a check of that analysis, <br />it does verify that the structural <br />conditions observed <br />during this inspection are consistent with those assumed in <br />that <br />analysis. <br />ELEMENT INSPECTION RATINGS <br />AND COMMENTARY <br />Elem Defect Defect Element <br />Description Env <br />Total <br />Units Qty in each Condition State <br />No. /Prot <br />Qty <br />St. 1 St, 2 St, 3 St, 4 <br />241 Culvert -RC <br />2 <br />43 <br />m 43 0 0 0 <br />(241) <br />Dense vegetation is growing along the left side of the structure. There is an outstanding work <br />recommendation dated 10/31/2000 to remove the vegetation. <br />The 10/15/2012 inspection indicated that there is an erosion hale forming at the right side of <br />Abutment 5. Due to dense vegetation and high water levels during this inspection, this condition <br />could not be verified. There is an outstanding work recommendation dated 10/06/2008 to backfill the <br />hole. <br />330 Railing -Metal 2 31 m 16 15 0 0 <br />1900 Distortion 2 15 0 15 0 0 <br />(330-1900) <br />There are several areas of minor distortion measuring up to 3 inches downwards located throughout the <br />left and right metal beam guard rails (see Photos 2 and 3 from the BIR dated 06/15/2016), <br />RecDate: <br />10/06/2008 <br />EstCost: <br />Backfill the erosion hole at the right <br />Action <br />Drainage Issue <br />StrTarget: <br />2 YEARS side of Abutment 5 and install a drainage <br />Work By: <br />LOCAL AGENCY <br />DistTarget: <br />system. <br />Status : <br />PROPOSED <br />EA: <br />RecDate: 10/31/2000 EstCost: Remove the vegetation growing along the <br />Action Remove Vegetation StrTarget: 2 YEARS left side of the structure. <br />Work By: LOCAL AGENCY DistTarget: <br />Status : PROPOSED EA: <br />RecDate: 10/31/2000 EstCost: Remove the silt that has accumulated <br />Action Sub-Misc. StrTarget: 2 YEARS within all of the spans of the culvert. <br />Work By: LOCAL AGENCY DistTarget: <br />Status : PROPOSED EA: <br />Printed on: Tuesday 07/21/2020 03 :OS PM 29C0181/AAAI/61133 <br />