Laserfiche WebLink
Printed on:Thursday 10/03/2024 11:46 AM 29C0181/AAAJ/136926Pageof55 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Misc <br />10/31/2000 <br />Str Target ROUTINE <br />Remove the silt that has accumulated within all of the spans of the culvert. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Drainage/Erosion Iss <br />Remove Vegetation <br />10/06/2008 <br />10/31/2000 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Backfill the erosion hole at the right side of Abutment 5 and install a drainage system. <br />Remove the vegetation growing along the left side of the structure. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Photo 1 <br />Looking southwest at Abutment 5 <br />Photo 2 <br />Looking east at the left side of the structure <br />Photo 3 <br />Map View <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS