Laserfiche WebLink
Printed on:Monday 10/14/2024 01:08 PM 29C0184/AAAJ/136931Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Scour-Place Counterm <br /> $106/26/2018 <br />Str Target ROUTINE <br />Mitigate the scour along the upstream invert and at the right wingwall at Abutment 5. The local agency should investigate and provide <br />adequate scour mitigation in accordance with federal standards. Refer to the current version of FHWA HEC-23 ("Bridge Scour and <br />Stream Instability Countermeasures: Experience, Selection and Design Guidance") for a full description of the requirements for <br />countermeasure methods and design specifications meeting federal standards. <br />Dist Target <br />EA Status PROPOSED <br />Photo 1 <br />Map View <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE <br />WORK RECOMMENDATIONS <br />Photo 13 <br />Exposed wingwall footing on the right side of Abutment 5 <br />CULVERT PHOTOGRAPHS