Laserfiche WebLink
Printed on:Monday 10/14/2024 01:28 PM 29C0186/AAAR/139483Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Rail-Misc <br />10/06/2004 <br />Str Target ROUTINE <br />Blast clean and paint the left bridge rail. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Misc <br />10/06/2004 <br />Str Target ROUTINE <br />Remove all the rust from exposed reinforcing steel on Girder 2 in Span 2, paint with epoxy rust sealer, and patch spall. (rev. 10/2014 <br />H.Kuntz) <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Patch spalls <br />10/09/2014 <br />Str Target ROUTINE <br />Remove the unsound concrete from the spalls and incipient spalls on the outside edge of the right side curb at Posts 5, 6, and 7 as <br />counted from Abutment 3. After removal, patch the areas. (H.Kuntz) <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS