Laserfiche WebLink
Printed on:Friday 09/15/2023 03:37 PM 29C0212/AAAL/105992Pageof1 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />9 <br /> Routine-Roadway View (03/19/2019) Routine-Elevation View (03/19/2019) <br /> Routine-Underside View (03/19/2019) Routine-Map View (06/15/2023) <br />PHOTOGRAPH IDENTIFICATION <br />1.5 MI EAST MILTON RDLOCATION <br />TEAM LEADER Pamela Gagnier <br />FACILITY CARRIED COPPEROPOLIS RD <br />No. <br />REPORT AUTHOR David Bonar <br />FEATURE INTERSECTED MORMON SLOUGH <br />BRIDGE LOCATION INFORMATION <br /> 37°58'18.27"LATITUDE <br />Anthony Fernandes (Registered Civil Engineer) <br />INSPECTED BY D.Bonar/P.Gagnier <br />N N/A (NBI)CULVERT <br />7 GOODDECK <br />7 GOODSUBSTRUCTURE <br />7 GOODSUPERSTRUCTURE 87.7SUFFICIENCY RATING <br />STRUCTURALLY DEFICIENT (SD) STATUS NOT SD <br /> 521 <br />PAINT CONDITION N/A <br />STRUCTURAL HEALTH CONDITION SUMMARY INFORMATION <br />6 EQUAL MIN CRITERIASTRUCTURE EVALUATION <br />121°06'49.16"LONGITUDE <br />5 STABLE W/IN FOOTING OR PILSCOUR <br />INVENTORY RTE(ON/UNDER)140000000ON <br />POSTMILE 0 <br />ON NATIONAL HIGHWAY SYSTEM NOT ON NHS <br />(9) <br />(11) <br />(16) <br />(17) <br />(7) <br />(6) <br />(5) <br />(104) <br />(58) <br />(59) <br />(60) <br />(62) <br />(67) (113) <br />Routine Inspection <br />BRIDGE INSPECTION REPORT <br />Anthony <br />Fernandes <br />06/30/2024 <br />CIVIL <br />60501 <br />9/15/2023 <br />Date <br />Exp. <br />BRIDGE NO.: <br />29C0212 <br />STRUCTURE NAME: <br />MORMON SLOUGH March 23, 2023 <br />INSPECTION DATE: <br />DECK AREA (M) 2