Laserfiche WebLink
Printed on:Friday 07/21/2023 10:20 AM 29C0215/AAAJ/110508Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />6 <br />UpstreamSide 02/07/2023X-Section Date <br />Top of RC Deck (right)Measured From <br /> 1.10 <br /> 1.10 <br /> 2.15 <br /> 2.50 <br /> 2.20 <br /> 1.40 <br /> 0.90 <br />Vert(m) <br />Face of Abutment <br />Midspan 1 <br />Midspan 2 - Thalweg <br />Midspan 3 <br />Face of Abutment <br />Abutment 1 <br />Pier 2 <br />Pier 3 <br />Abutment 4 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 2.29 <br /> 4.57 <br /> 7.62 <br /> 10.67 <br /> 12.95 <br /> 15.24 <br />Photo 1 <br />Map View <br />OTHER PHOTOGRAPHS <br />205 <br />215 <br />234 <br />252 <br />Column-RC <br />Abutment-RC <br />Pier Cap-RC <br />Pile-CIDH <br />2 <br />2 <br />2 <br />2 <br />8 <br />39 <br />25 <br />1 <br />each <br />m <br />m <br />ea. <br /> 8 <br /> 39 <br /> 25 <br /> 1 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />(205) Column-RC <br />(215) Abutment-RC <br />(234) Pier Cap-RC <br />(252) Pile-CIDH <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There were no significant defects noted. <br />The quantity of this element includes the monolithic wingwalls. <br />There were no significant defects noted. <br />There were no significant defects noted. <br />The pile element is included to indicate the presence of piles on this structure. The piles were not exposed for visual inspection. No <br />indication of pile distress was noted in any substructure element.