Laserfiche WebLink
Printed on:Sunday 03/03/2024 07:24 AM 29C0249/AAAO/122389Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Misc <br />01/19/2022 <br />Str Target ROUTINE <br />In accordance with the Scour Plan of Action (07/14/2021): <br />Paint water elevation marks on the piers and piles to determine the 100 year flood. <br />Conduct deck elevation surveys annually and after 100 year flood. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Joints-Replace <br />01/14/2016 <br />Str Target ROUTINE <br />Replace the joint seals at Bent 8 and at Bent 15. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Patch spalls <br />03/12/2012 <br />Str Target ROUTINE <br />Patch the spall at left edge of soffit in span 19. <br />Dist Target <br />EA Status PROPOSED <br />Photo 5 <br />Approach AC (near Abutment 1) <br />Photo 6 <br />Approach AC (near Abutment 20) <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS