My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C0258_AAAS_2025-APR
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-258
>
29C0258_AAAS_2025-APR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 9:17:31 AM
Creation date
6/3/2025 9:17:24 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-258
Type - Bridge Supporting Doc
Inspection
Name
Mokelumne River - Bruella Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Tuesday 05/27/2025 04:20 PM 29C0258/AAAS/149218Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Patch spalls <br />Sub-Remove Debris <br />01/30/2023 <br />07/12/2021 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Remove all unsound concrete, blast clean existing rebar, and patch the spalls in Pier Cap 10 and 12 with structure <br />concrete material. <br />Remove debris accumulating along the channel and at the upstream nose of piers. Also remove abandoned timber piles <br />along with any other obstruction located throughout the channel which may accumulate drift. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Rail-Repair <br />01/30/2023 <br />Str Target ROUTINE <br />Repair the damaged metal beam bridge rail (MBBR) in Span 2 right (20 foot section and 3 posts). <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS
The URL can be used to link to this page
Your browser does not support the video tag.