Laserfiche WebLink
Printed on:Tuesday 05/27/2025 04:20 PM 29C0258/AAAS/149218Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Patch spalls <br />Sub-Remove Debris <br />01/30/2023 <br />07/12/2021 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Remove all unsound concrete, blast clean existing rebar, and patch the spalls in Pier Cap 10 and 12 with structure <br />concrete material. <br />Remove debris accumulating along the channel and at the upstream nose of piers. Also remove abandoned timber piles <br />along with any other obstruction located throughout the channel which may accumulate drift. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Rail-Repair <br />01/30/2023 <br />Str Target ROUTINE <br />Repair the damaged metal beam bridge rail (MBBR) in Span 2 right (20 foot section and 3 posts). <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS