Laserfiche WebLink
0 <br />A <br />A, <br />METAL BEAM GUARD RAIL <br />(INCLUDING TRANSITION SECTION-THRIE BEAM TO M.B.G.R.) <br />Location Quantity <br />Southwest Corner of Bridge 31.5 L.F. <br />Southeast Corner of Bridge 31.5 L.F. <br />Total 63 L.F. <br />SINGLE THRIE BEAM &POSTS <br />(BRIDGE) <br />Location <br />Westside of Bridge <br />Eastside of Bridge <br />Quantity <br />675 L.F. <br />675 L.F. <br />Total1,350 L.F. <br />TERMINAL SYSTEM <br />Location <br />Southwest Corner of Bridge <br />Southeast Corner of Bridge <br />(TYPE S RT) <br />Quantity <br />QUADGUARD RAIL SYSTEM <br />1 Ea. <br />1 Ea. <br />2 Ea. <br />Location Quantity <br />Northwest Corner of Bridge 1 Ea. <br />Northeast Corner of Bridge 1 Ea. <br />2 Ea. <br />RECORD DRAWING <br />Correriions By ra5?r <br />No Changes By <br />[date +/ f � -0 2 <br />Any Person Using Trns Drawing Should Verity <br />All information By inspecting The Site Of Work, <br />COUNTY OF SAN JOA UIN NO SCALE SUMMARY OF QUANTITIES BRUELLA ROAD BRIDGE NO.29C-258 BARRIER RAILING REPLACEMENT Sheet No. <br />Q I I -ACROSS MOKELUMNE RIVER 'f of 9 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE ECOMMENDED DATE <br />1shAU h <br />l <br />