My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-29C-286
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-286
>
2023-29C-286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 10:42:02 AM
Creation date
6/3/2025 10:41:53 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-286
Type - Bridge Supporting Doc
Inspection
Name
South Paddy Creek - Hibbard Road
Text box
ID:
1
Creator:
Created:
6/3/2025 10:42 AM
Modified:
6/3/2025 10:42 AM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2023_09_18_09-23-50_IMG_2342_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Friday 10/13/2023 04:42 PM 29C0286/AAAN/115742Pageof55 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />Photo 7 <br />Abutment Joint (Abutment 1) <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />DECK WORK RECOMMENDATIONS - NONE <br />215 <br />252 <br />Abutment-RC <br />Pile-CIDH <br />2 <br />2 <br />36 <br />1 <br />m <br />ea. <br /> 36 <br /> 1 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />WORK RECOMMENDATIONS <br />(215) Abutment-RC <br />(252) Pile-CIDH <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The abutment quantity includes the monolithic wingwalls. The vertical joint between the original section of Abutment 1 and the <br />widening is out of alignment (see Photo 7). There were no significant defects noted. <br />The pile element is included to indicate the presence of piles on this structure. The piles were not exposed for visual inspection. No <br />indication of pile distress was noted in any substructure element.
The URL can be used to link to this page
Your browser does not support the video tag.