Laserfiche WebLink
Printed on:Sunday 03/03/2024 06:13 AM 29C0289/AAAN/121971Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />UpstreamSide 01/04/2024X-Section Date <br />Top of Deck (right)Measured From <br /> 3.57 <br /> 2.95 <br /> 1.51 <br /> 0.80 <br />Vert(m) <br />Midspan <br />Midspan <br />Face of Abutment <br />Bent 3 <br />Abutment 4 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 8.80 <br /> 12.69 <br /> 15.05 <br /> 17.63 <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Photo 1 <br />Roadway (from Abutment 4 side looking south) <br />Photo 2 <br />Elevation (UAS - left side) <br />Photo 3 <br />Underside (from Span 1 looking north) <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS