Laserfiche WebLink
Printed on:Wednesday 04/30/2025 02:25 PM 29C0301/AAAO/151730Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Remove Debris <br />02/18/2021 <br />Str Target ROUTINE <br />Remove the discarded debris from both the upstream and downstream creek beds. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)8 <br />WORK RECOMMENDATIONS <br />(256) Slope Protection <br />(256-6000) Scour <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />condition has been previously reported and no significant changes were noted. <br />There is full width scour along the bottom of the slope protection at both abutments. At Abutment 1 the scour is up to 21 inches and <br />at Abutment 3 it is up to 20 inches. (See Photos 8 and 9 dated 02/18/2021). This condition has been previously reported and no <br />significant changes were noted.