Laserfiche WebLink
Printed on:Monday 07/31/2023 03:55 PM 29C0305/AAAN/111940Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Misc. <br />03/30/1999 <br />Str Target ROUTINE <br />Remove the accumulated silt in Spans 1, 3, and 4. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Scour-Place Counterm <br />02/28/2001 <br />Str Target ROUTINE <br />The local agency should evaluate and place scour countermeasures at Pier 2 in accordance with the current edition of HEC-23 <br />"Bridge Scour and Stream Instability Countermeasures: Experience, Selection and Design Guidance", FHWA. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Patch spalls <br />03/06/2007 <br />Str Target ROUTINE <br />Remove unsound concrete, sandblast rebar, and patch the spalls on the exterior and bottom corners of the RC slab on both sides of <br />the bridge. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS