My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-29C-313uw
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-313
>
2025-29C-313uw
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 11:57:28 AM
Creation date
6/3/2025 11:57:26 AM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-313
Type - Bridge Supporting Doc
Inspection
Name
Tom Paine Slough - Macarthur Drive
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Sunday 04/13/2025 08:52 PM 29C0313/AAAQ/148033Pageof3 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />6 <br /> 6.5Max. Water Depth <br />N/AContract No. <br />N/AContractor <br />A - WadeDive Mode <br />Michael GramsDiver <br />Supervisor <br />Tender <br />Mitch MillerBackup Diver <br />UNDERWATER INVESTIGATION DETAILS <br />Max. Visibility <br />Water Surface Elev. <br />ft <br />ft 2.0 <br />STEEL INVESTIGATION DETAILS <br />UNDERWATER ELEMENTS INVESTIGATED <br />SCOPE AND ACCESS <br />All elements listed in the "Underwater Elements Investigated" section of the report were inspected from the waterline down to the <br />mudline. The inspection of the remainder of the element and all other elements is the responsibility of the routine inspection. <br />This structure was inspected from the west bank using wade, float, and probe inspection techniques. The inspector used an inflated <br />drysuit for flotation and a pole, 8 feet long, to probe and inspect the structure. Inspecting operations were staged from shore and <br />inspector access was from the northeast bank. <br />This underwater inspection follows the procedures of Section 5.4 of the SM&I Procedures Manual. <br />SUBSTRUCTURE <br />All submerged elements were covered with a thin layer of growth which could easily be removed by the inspector's gloved hands. This <br />condition allowed for a 100% Level I inspection and a minimum of 10% Level II inspection of the submerged portions of the elements. <br />For reference purposes, the height from waterline to the top of rail was 13.0 feet at Bent 3, Column 5 at 1140 hours on the day of this <br />inspection. <br />The following depths and/or miscellaneous conditions were noted: <br />Bent 2: <br />Column 1 Mudline - 5.0 feet <br />Column 5 Mudline - 6.5 feet <br />Bent 3: <br />Column 1 Mudline - 6.0 feet <br />Column 5 Mudline - 5.5 feet <br />Bent 4: <br />Column 1 Mudline - 4.0 feet <br />Column 5 Mudline - 4.5 feet <br />Element 204, Column - PS Concrete. <br />See ELI table for condition state and rating. <br />Prior to this inspection the SNBI B.C.15 Underwater Inspection rating was coded 6. The conditions present on the date of this inspection <br />are consistent with a SNBI rating of 8. <br />WATERWAY <br />Prior to this inspection the SNBI B.C.09 Channel rating was coded 8. The conditions present on the date of this inspection are consistent <br />with a SNBI rating of 7. NBI Item 61 decreased from 8 to 7. <br />Prior to this inspection the SNBI B.C.10 Channel Protection rating was coded 6. The conditions present on the date of this inspection are <br />consistent with a SNBI rating of 7. The riprap at Abutment 1 is deteriorated. <br />Prior to this inspection the SNBI B.C.11 Scour condition rating was coded 6. The conditions present on the date of this inspection are <br />consistent with a SNBI rating of 8. <br />Prior to this inspection the SNBI B.AP.03 Scour Vulnerability rating was directly transitioned from the NBI Item 113 Scour Critical Bridge <br />Rating and was assigned a temporary rating of (AB-T). The conditions present on the date of this inspection are consistent with a SNBI <br />rating of (AB-T). <br />INSPECTION COMMENTARY <br />ft <br />1 - FreshWater TypeB - Routine UWDive Type <br />Next UWI 12/09/2029UWI Frequency months 60UWI Required Y Last UWI 12/09/2024 <br />- NOT APPLICABLE FOR THIS BRIDGE. <br />CONDITION INFORMATION <br />0Max. Water Velocity ft/s <br />SPECIAL INSPECTION INFORMATION
The URL can be used to link to this page
Your browser does not support the video tag.