Laserfiche WebLink
Printed on:Friday 02/14/2025 11:47 AM 29C0315/AAAO/148027Pageof1 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />5 <br /> Routine-Roadway View (11/09/2022) Routine-Elevation View (11/09/2022) <br /> Routine-Underside View (11/09/2022) Routine-Map View (04/13/2023) <br />PHOTOGRAPH IDENTIFICATION <br />0.5 MI S OF LONE TREE RDLOCATION <br />TEAM LEADER Pamela Gagnier <br />FACILITY CARRIED VAN ALLEN RD <br />No. <br />REPORT AUTHOR Pamela Gagnier <br />FEATURE INTERSECTED LONE TREE CREEK <br />BRIDGE LOCATION INFORMATION <br /> 37°49'13.75"LATITUDE <br />Anthony Fernandes (Registered Civil Engineer) <br />INSPECTED BY P.Gagnier/D.Bonar <br />N N/A (NBI)CULVERT <br />(6 SATISFACTORY)DECK <br />5 FAIRSUBSTRUCTURE <br />(6 SATISFACTORY)SUPERSTRUCTURE 62.6SUFFICIENCY RATING <br />STRUCTURALLY DEFICIENT (SD) STATUS NOT SD <br /> 60 <br />PAINT CONDITION N/A <br />STRUCTURAL HEALTH CONDITION SUMMARY INFORMATION <br />5 ABOVE MIN TOLERABLESTRUCTURE EVALUATION <br />121°03'09.94"LONGITUDE <br />5 STABLE W/IN FOOTING OR PILSCOUR <br />INVENTORY RTE(ON/UNDER)140000000ON <br />POSTMILE 0 <br />ON NATIONAL HIGHWAY SYSTEM NOT ON NHS <br />(9) <br />(11) <br />(16) <br />(17) <br />(7) <br />(6) <br />(5) <br />(104) <br />(58) <br />(59) <br />(60) <br />(62) <br />(67) (113) <br />Routine Inspection <br />BRIDGE INSPECTION REPORT <br />Anthony <br />Fernandes <br />06/30/2026 <br />CIVIL <br />60501 <br />2/14/2025 <br />Date <br />Exp. <br />BRIDGE NO.: <br />29C0315 <br />STRUCTURE NAME: <br />LONE TREE CREEK November 6, 2024 <br />INSPECTION DATE: <br />DECK AREA (M) 2