My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008co-29C-317
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-317
>
2008co-29C-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 12:08:40 PM
Creation date
6/3/2025 12:08:30 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-317
Type - Bridge Supporting Doc
Inspection
Name
SSJID Canal - Henry Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BRIDGE INSPECTION REPORT <br />Br. No: 29C 3,31t- Date Inspected I 2 %L <br />Dept. of Public Works <br />San Joaquin County <br />14h. Skew: ❑ Yes Pgo 141. Deck Over y/Treatment: 277ACC. ❑ Chip Seal ElMethacrylate [I Other: <br />14j. Deck Drainage: [I Scupper [I Vertical Plpe None 0 N/A ❑ Other <br />Condition. []No significant defects note, ❑Clogged from ❑Debris ❑Vegetation growth, Other <br />14k. Deck Condition(s): Surface <br />❑ No significant defects note ❑Pattern ❑Random cracks @ Span ❑ Lt ❑ Rt <br />Condition Rating ❑ Longitudinal cracks @ Span ❑ Concrete ❑ A C. Overlay ❑ Lt ❑ Rt <br />(Deck): <br />❑ Transverse cracks @ Span ❑ Concrete ❑ A.0 Overlay ❑ Lt ❑ Rt <br />❑ Scaling ❑ Light ❑Medium ❑ Heavy ❑ ❑ Lt ❑ Rt <br />Q� Transverse cracks on A.C. overlay bebusaa -I . , ,�,,,., ��..... <br />Er'AIligator cracks on A C. overlay <br />❑ ar Delamination found @ Span [ILt ElRt <br />Deck overlay prevent proper visual inspection ❑ Spall @ Span ❑ Lt ❑ Rt <br />Other <br />—Soffit <br />p' No significant defects note ❑ Pattern cracks @ Span ❑ Lt ❑ Rt <br />❑tongitudinal cracks @ Span [I Lt [I Rt <br />ransverse cracks @ Span " �Lt W'kt <br />❑ Hairline Cracks @ Span ❑ Lt ❑ Rt ❑ Abrasion <br />❑ Rebarexposure ❑Section Loss ❑ Corroding <br />❑ Efflorescence @ Span ❑ 1/01-t ❑Rt; ❑ 2/❑Lt ❑Rt, ❑3/❑Lt ❑Rt, ❑4/❑Lt ❑ Rt; 051 ❑Lt ❑ Rt, <br />❑Corrosion on metal decking @ Span ❑ Lt ❑ Rt Span ❑ Lt ❑ Rt []Section Loss <br />❑ Timber planks decaying due to []moisture infiltration []fungus growth []Section Loss - Depth " <br />@ Span ❑ Lt ❑ Rt Span ❑ Lt ❑ Rt Span ❑ Lt ❑ Rt <br />❑ Other: <br />4 <" <br />14t Super Struct. Condition(.)other hen Deck: -q1S `+ <br />2/N/A ❑ No significant defects noted <br />❑ Diagonal cracks @ Span []Lt ❑Rt; ❑ Longitudinal cracks @ Span ❑Lt ❑Rt, <br />Condition Rating <br />(Super-struct): [I Hairline cracks @ Span []Lt []Rt; ❑ Vertical cracks @ Span ❑Lt ❑Rt, <br />❑ Pattern cracks @ Span []Lt []Rt; ❑ Spalling @ Span ❑Lt ❑Rt, <br />❑ Timber stringer surface check ❑End Check ❑Through Check []Water stain Span ❑ Lt ❑ Rt <br />❑ Timber stringer decaying due to []moisture infiltration ❑ Mold/fungus growth []Section Loss - Depth <br />Damaged Stringer No Span No Span No Span <br />❑ Broken Stringer No . Span No Span No Span <br />❑ Bearing damage due to []moisture infiltration ❑fungus growth []Section Loss - Depth <br />Damaged Stringer No Abutment _ Bent Stringer No Abutment _ Bent <br />❑ Other. <br />15. BRIDGE SUBSTRUCTURE / FOUNDATION <br />15a. Abutment Type: 2IOConcrete Diaphragm ❑ Timber Bent Abutment (Type End Dam) ❑ Timber pile on Sole plate bearing over Conc Footing <br />❑ Driven Timber pile <br />.,❑/12x12 cap ❑ 3x12 Planks Backing Timber Pile/Abut Ea 012x12 ❑ Round _ <br />15b. Foundation Type (Abut): [Ip Concrete Spread Footing ❑ Pile ❑ Other <br />15c. Condition Abut: 0 No significant defects noted <br />,f" ❑ Longitudinal crack @ <br />Condition L'S ertical cracks @ AWcr� [I Transverse cracks @ <br />Rating r„ Abrasion @ all vertical surfaces ❑ Undermining @ Diaphragm <br />(Substruct): []'Scour @ "0 ❑ RSP <br />❑ Graffiti <br />❑ Timber Pile is decaying duet Aging ❑ Mold/fungus growth ❑Section Loss - Depth <br />❑ Timber planks decaying due to []moisture infiltration ❑ Mold/fungus growth ❑Section Loss - Depth <br />❑ Other <br />15d. Wing Wall Type: Concrete ❑� /Timber (End Dam) ❑ 3x12 Planks Timber Pile Ea ❑12x12 ❑ Round _ <br />15e. Foundation Type (WW): ❑ Concrete L- Spread Footing ❑ Other <br />15f. WW Shape: ❑ Straight Skew ❑ Other <br />15g. Condition WW: ❑ No significant defects noted ❑ longitudinal crack @ <br />Vertical cracks @ ❑ Transverse cracks @ <br />Abrasion @ all vertical surfaces ❑ undermining @ ❑ NE ❑ NW ❑ SE ❑ SW Wingwall ❑ Graffiti <br />O XBRIDGE INSPECTIONSUmp foam"dm <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.