My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-29C-323
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-323
>
2025-29C-323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 12:25:08 PM
Creation date
6/3/2025 12:25:01 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-323
Type - Bridge Supporting Doc
Inspection
Name
Roadside Drain - Murphy Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Saturday 04/19/2025 07:34 AM 29C0323/AAAO/148955Pageof55 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />DESCRIPTION UNDER STRUCTURE <br />CHANNEL DESCRIPTION <br />The downstream side of the channel has been backfilled. <br />TYPE OF SERVICE UNDER <br />N NOT APPLICABLE (NBI)UNDERCLEARANCES V - H <br />4 TOLERABLEWATER ADEQUACY <br /> MVERT-LIFT BRIDGE NAV MIN VERTICAL CLEAR <br />NAVIGATION CONTROL <br />0.0 MNAVIGATION HORIZONTAL CLEARANCE <br />0.0 MNAVIGATION VERTICAL CLEARANCE <br />PIER PROTECTION <br />0: NO CONTROL5-WATERWAY <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />9 ON DRY LANDSCOUR <br />N/ASCOUR POA DATE <br />CHANNEL PROTECTION 6 BANK SLUMPING <br />N/A <br />(42b) <br />(69) <br />(71) <br />(61) <br />(113) <br />(38) <br />(111) <br />(39) <br />(116) <br />(40) <br />DECK WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES - NONE <br />210 <br />215 <br />Pier Wall-RC <br />Abrasion (PS Conc./RC) <br />Abutment-RC <br />2 <br />2 <br />2 <br />7 <br />3 <br />21 <br />m <br />each <br />m <br /> 4 <br /> 0 <br /> 21 <br /> 3 <br /> 3 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br /> 0 <br />1190 <br />SUPERSTRUCTURE <br />SUBSTRUCTURE <br />SUPERSTRUCTURE RATING =(59) 7 <br />SUBSTRUCTURE RATING =(60)7 <br />WORK RECOMMENDATIONS <br />(210-1190) Abrasion (PS Conc./RC) <br />(215) Abutment-RC <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There is moderate abrasion with exposed coarse aggregate below the waterline on both sides. <br />The abutment quantity includes the monolithic wingwalls. <br />From the 01/11/2021 BIR: There were no significant defects noted. <br />(36a) Rail Code 0000 <br />331 Railing-RC <br />Delamination/Spall/Patched Area <br />2 <br />2 <br />14 <br />2 <br />m <br />each <br /> 12 <br /> 0 <br /> 2 <br /> 2 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />JOINT/APPROACH/RAIL ELEMENT INSPECTION RATINGS AND NOTES <br />1080 <br />(36b) Transition (36c) Appr Guardrail (36d) Appr Guardrail End 45Roadway Speed MPH <br />JOINT - APPROACH - RAIL <br />(331-1080) Delamination/Spall/Patched Area <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There is a six foot long patched area along the outer left bridge rail over Pier 2 (see BIR 01/12/2023 Photos 8 and 9).
The URL can be used to link to this page
Your browser does not support the video tag.