My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-29C-330
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-330
>
2024-29C-330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 1:06:23 PM
Creation date
6/3/2025 1:06:12 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-330
Type - Bridge Supporting Doc
Inspection
Name
Lone Tree Creek - Murphy Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Friday 12/13/2024 02:25 PM 29C0330/AAAO/147632Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Fix Scour Critic <br />02/24/1999 <br />Str Target ROUTINE <br />The local agency should evaluate and place scour countermeasures in accordance with the current edition of HEC-23 <br />"Bridge Scour and Stream Instability Countermeasures: Experience, Selection and Design Guidance", FHWA. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Rail-Repair <br />09/25/2024 <br />Str Target ROUTINE <br />Repair the spalling in the interior side of both rails. <br />Dist Target <br />EA Status PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Patch spalls <br />03/20/2001 <br />Str Target ROUTINE <br />Repair the spalls in Span 2 of the soffit. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />215 <br />220 <br />Abutment-RC <br />Pile Cap/Footing-RC <br />Scour <br />2 <br />2 <br />2 <br />21 <br />10 <br />10 <br />m <br />m <br />each <br /> 21 <br /> 0 <br /> 0 <br /> 0 <br /> 10 <br /> 10 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br /> 06000 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />WORK RECOMMENDATIONS <br />(210) Pier Wall-RC <br />(215) Abutment-RC <br />(220-6000) Scour <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The pier wall was not inspected during this investigation. <br />There were no significant defects noted. <br />The abutment was not inspected during this investigation. <br />This quantity includes monolithic wingwalls. <br />There were no significant defects noted. <br />The defects below were only inspected by probing from the deck. <br />There is scour along the full width of Abutment 1. The footing was encountered with probing and exposed vertically approximately 6 <br />inches. No undermining was encountered. <br />The Pier 2 footing was probed and visually inspected through clear water and it was determined that the previously exposed footing <br />at the downstream (left) side of Pier 2 has agraded on the Span 1 side.
The URL can be used to link to this page
Your browser does not support the video tag.