Laserfiche WebLink
Printed on:Tuesday 05/27/2025 03:56 PM 29C0338/AAAK/152225Pageof88 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />Photo 2 <br />Abutment 4 left wingwall and rail discoloration <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Methacrylate <br />01/27/2023 <br />Str Target ROUTINE <br />Treat the bridge deck with methacrylate. <br />Dist Target <br />EA Status PROPOSED <br />227 Pile-RC 2 1 ea. 1 0 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />WORK RECOMMENDATIONS <br />(227) Pile-RC <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The pile element is included to indicate the presence of piles on this structure. The piles were not exposed for visual inspection. No <br />indication of pile distress was noted in any substructure element.