Laserfiche WebLink
Printed on:Wednesday 05/07/2025 07:24 AM 29C0339/AAAL/149449Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />6 <br />Photo 5 <br />Encampment 02/10/2025 (right side) <br />Photo 6 <br />Encampment Cleared Out 03/12/2025 (left side) <br />Photo 7 <br />Soot <br />OTHER PHOTOGRAPHS <br />256 Slope Protection <br />Deterioration (Other) <br />2 <br />2 <br />2 <br />2 <br />ea. <br />each <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 2 <br /> 2 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 01220 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)7 <br />(252) Pile-CIDH <br />(256-1220) Deterioration (Other) <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />indication of pile distress was noted in any substructure element. <br />The embankment along Abutment 4 has been excavated (see BIR 02/02/2023 Photos 16 and 17). The rock slope protection under <br />the bridge has been displaced.