My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-29C-344
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-344
>
2023-29C-344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 1:44:35 PM
Creation date
6/3/2025 1:44:26 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-344
Type - Bridge Supporting Doc
Inspection
Name
Duck Creek - Hollenbeck
Text box
ID:
1
Creator:
Created:
6/3/2025 1:44 PM
Modified:
6/3/2025 1:44 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2023_03_24_10-02-53_IMG_5654_RESIZE.JPG
ID:
2
Creator:
Created:
6/3/2025 1:44 PM
Modified:
6/3/2025 1:44 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/PGAGNIER/2023_03_24_10-03-30_IMG_5658_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Tuesday 08/22/2023 09:18 AM 29C0344/AAAN/111941Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />7 <br />DESCRIPTION UNDER STRUCTURE <br />CHANNEL DESCRIPTION <br />Sinuous creek situated in a wide floodplain with moderately vegetated slopes (weeds). The bed is comprised of silt and clay. <br />TYPE OF SERVICE UNDER <br />N NOT APPLICABLE (NBI)UNDERCLEARANCES V - H <br />8 EQUAL DESIRABLEWATER ADEQUACY <br /> MVERT-LIFT BRIDGE NAV MIN VERTICAL CLEAR <br />NAVIGATION CONTROL <br />0.0 MNAVIGATION HORIZONTAL CLEARANCE <br />0.0 MNAVIGATION VERTICAL CLEARANCE <br />PIER PROTECTION <br />0: NO CONTROL5-WATERWAY <br />5 STABLE W/IN FOOTING OR PILESCOUR <br />N/ASCOUR POA DATE <br />CHANNEL PROTECTION 5 BANK PROT ERODED <br />N/A <br />(42b) <br />(69) <br />(71) <br />(61) <br />(113) <br />(38) <br />(111) <br />(39) <br />(116) <br />(40) <br />SUPERSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES - NONE <br />205 <br />215 <br />Column-RC <br />Abutment-RC <br />2 <br />2 <br />8 <br />30 <br />each <br />m <br /> 8 <br /> 30 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br />SUPERSTRUCTURE <br />SUBSTRUCTURE <br />SUPERSTRUCTURE RATING =(59) (6) <br />SUBSTRUCTURE RATING =(60)7 <br />(205) Column-RC <br />(215) Abutment-RC <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There is minor abrasion on the pile extensions above the waterline. Small aggregate was visible and appeared sound. The condition <br />did not warrant a defect of Element 205. <br />There were no significant defects noted. <br />The monolithic wingwalls have been included in the quantity of Element 215. <br />330 Railing-Metal 2 44 m 44 0 0 0 <br />JOINT/APPROACH/RAIL ELEMENT INSPECTION RATINGS AND NOTES <br />JOINT - APPROACH - RAIL <br />(330) Railing-Metal <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The bridge rails were galvanized. <br />There were no significant defects noted. <br />Photo 2 <br />Condition AC approach at Abutment 1 <br />Photo 3 <br />Condition AC approach Abutment 4 <br />JOINT/APPROACH/RAIL PHOTOGRAPHS
The URL can be used to link to this page
Your browser does not support the video tag.