Laserfiche WebLink
Printed on:Wednesday 05/07/2025 07:06 AM 29C0354/AAAO/148546Pageof55 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />Photo 6 <br />Slope Protection (Bent 2) <br />Photo 7 <br />Slope Protection (Bent 3) <br />SUBSTRUCTURE PHOTOGRAPHS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Bridge-Misc <br />01/11/2021 <br />Str Target ROUTINE <br />Remove mud and debris on the bridge deck. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />256 Slope Protection <br />Deterioration (Other) <br />2 <br />2 <br />4 <br />2 <br />ea. <br />each <br /> 2 <br /> 0 <br /> 2 <br /> 2 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 01220 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)8 <br />WORK RECOMMENDATIONS <br />(215) Abutment-RC <br />(256) Slope Protection <br />(256-1220) Deterioration (Other) <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The abutment quantity includes the monolithic wingwalls. <br />There were no significant defects noted. <br />There is rock slope protection at all supports. <br />Some of the rock slope protection at the bents has been displaced (see Photos 6 and 7).