My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C0469_AAAB_2025-APR
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-469
>
29C0469_AAAB_2025-APR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 3:43:25 PM
Creation date
6/3/2025 3:43:10 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-469
Type - Bridge Supporting Doc
Inspection
Name
Temple Creek - Wildwood Road
Text box
ID:
1
Creator:
Created:
6/3/2025 3:43 PM
Modified:
6/3/2025 3:43 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2025_01_07_11-53-21_IMG_0111_RESIZE.JPG
ID:
2
Creator:
Created:
6/3/2025 3:43 PM
Modified:
6/3/2025 3:43 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2025_01_07_11-52-38_IMG_0109_RESIZE.JPG
ID:
3
Creator:
Created:
6/3/2025 3:43 PM
Modified:
6/3/2025 3:43 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2025_04_21_14-40-23_MAP.JPG
ID:
4
Creator:
Created:
6/3/2025 3:43 PM
Modified:
6/3/2025 3:43 PM
Text:
http://smi-prod.dot.ca.gov/biris/photos/KSHURBERT/2025_01_07_11-53-38_IMG_0112_RESIZE.JPG
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Monday 05/12/2025 03:58 PM 29C0469/AAAB/152056Pageof5 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />6 <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Photo 1 <br />Roadway (from Abutment 1 side) <br />Photo 2 <br />Elevation (right side) <br />Photo 3 <br />Underside (looking toward Abutment 2) <br />Photo 4 <br />Map View <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Methacrylate <br />01/18/2019 <br />Str Target ROUTINE <br />Treat the deck with methacrylate. <br />Dist Target <br />EA Status PROPOSED <br />215 <br />256 <br />Abutment-RC <br />Slope Protection <br />2 <br />2 <br />39 <br />2 <br />m <br />ea. <br /> 39 <br /> 2 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br /> 0 <br /> 0 <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)8 <br />WORK RECOMMENDATIONS <br />(215) Abutment-RC <br />(256) Slope Protection <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />The abutment quantity includes the monolithic wingwalls. There are no significant defects noted. <br />There are no significant defects noted.
The URL can be used to link to this page
Your browser does not support the video tag.