Laserfiche WebLink
Printed on:Wednesday 07/24/2024 06:00 PM 29C0470/DSMI/124829Pageof8 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />10 <br />UpstreamSide 04/10/2024X-Section Date <br />Top of RC Rail (Left)Measured From <br /> 2.40 <br /> 4.70 <br /> 5.40 <br /> 4.60 <br /> 2.70 <br />Vert(m) <br />Face of Abutment <br />Edge of water <br />Thalweg <br />Edge of water <br />Face of Abutment <br />Abutment 1 <br />Abutment 2 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 5.70 <br /> 8.50 <br /> 11.60 <br /> 15.70 <br />Photo 7 <br />Looking downstream <br />Photo 8 <br />Looking upstream <br />Photo 16 <br />General condition at Abutment 1 <br />Photo 17 <br />General condition at Abutment 2 <br />SUBSTRUCTURE PHOTOGRAPHS <br />SUBSTRUCTURE