My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C0486_AAAB_2025-JAN
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-486
>
29C0486_AAAB_2025-JAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 3:54:26 PM
Creation date
6/3/2025 3:54:18 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-486
Type - Bridge Supporting Doc
Inspection
Name
Temple Creek - South Wagner Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on:Wednesday 05/07/2025 07:06 AM 29C0486/AAAB/148546Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Sub-Fix Scour Critic <br />Sub-Rehab <br />12/12/2024 <br />03/27/2024 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Hydraulics Inspection (12/12/2024): Mitigate the scour vulnerability of Abutment 1, Pier 2 and Pier 3 foundations by <br />implementing scour countermeasures in accordance with the current version of FHWA Hydraulic Engineering Circular <br />No. 23 ("Bridge Scour and Stream Instability Countermeasures: Experience, Selection and Design Guidance") or by <br />structure rehabilitation or replacement. Refer to the 12/12/2024 Bridge Inspection Report for details of the scour at the <br />site and for a discussion of the scope of the potential scour problems at the bridge. <br />Rehabilitate the spalled and cracked portions of the substructure (most severe deterioration is along both ends of Pier 3). <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Super-Patch spalls <br />04/25/2024 <br />Str Target ROUTINE <br />Remove unsound concrete and patch spalls along the edge of deck. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS
The URL can be used to link to this page
Your browser does not support the video tag.