Laserfiche WebLink
Printed on:Wednesday 08/28/2024 12:09 PM 29C0488/AAAA/139161Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />DownstreamSide 08/08/2024X-Section Date <br />Top of RC RailMeasured From <br /> 2.61 <br /> 2.55 <br /> 2.36 <br /> 1.81 <br />Vert(m) <br />Face of abutment <br />Midspan <br />Toe of slope/Edge of water <br />Face of Abutment <br />Abutment 1 <br />6 feet away from A2 <br />Abutment 2 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 0.00 <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Remove Debris <br />01/21/2016 <br />Str Target ROUTINE <br />Remove/clear the reeds and vegetation just downstream of the structure to allow for access to the underside. <br />Remove garbage accumulated in the channel under and near the structure. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS