Laserfiche WebLink
Printed on:Tuesday 07/09/2024 03:44 PM 29C0488/DSMI/127270Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />DownstreamSide 04/25/2024X-Section Date <br />Top of Headwall (left)Measured From <br /> 2.57 <br /> 2.53 <br /> 1.75 <br />Vert(m) <br />Face of Abutment <br />Midspan <br />Face of Abutment <br />Abutment 1 <br />Abutment 2 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 3.45 <br /> 6.90 <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Sub-Remove Debris <br />01/21/2016 <br />Str Target ROUTINE <br />Remove/clear the reeds and vegetation just downstream of the structure to allow for access to the underside. <br />Remove garbage accumulated in the channel under and near the structure. <br />Dist Target <br />EA Status PROPOSED <br />Photo 1 <br />Roadway (from Abutment 2 side looking south) <br />Photo 1 <br />Map view. <br />Photo 2 <br />Elevation (left side) <br />Photo 3 <br />Underside (from left side looking NE) <br />OTHER PHOTOGRAPHS <br />DECK WORK RECOMMENDATIONS - NONE <br />WORK RECOMMENDATIONS