Laserfiche WebLink
Printed on:Friday 10/27/2023 12:33 PM 38C0040/AAAN/115282Pageof77 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />UpstreamSide 09/25/2023X-Section Date <br />Top of RC RailMeasured From <br /> 2.60 <br /> 6.30 <br /> 7.30 <br /> 7.40 <br /> 6.80 <br /> 6.70 <br /> 8.30 <br /> 10.61 <br /> 15.00 <br /> 16.30 <br /> 14.80 <br /> 9.40 <br /> 8.90 <br /> 8.40 <br /> 7.90 <br /> 7.30 <br /> 7.20 <br /> 6.80 <br /> 2.50 <br />Vert(m) <br />Edge of Water <br />Thalweg <br />Edge of Water <br />A1 <br />P2 <br />P3 <br />P4 <br />P5 <br />P6 <br />P7 <br />P8 <br />P9 <br />TWG <br />P10 <br />P11 <br />P12 <br />P13 <br />P14 <br />P15 <br />P16 <br />P17 <br />A18 <br />Location <br />CHANNEL X-SECTION <br />CommentsHoriz(m) <br /> 0.00 <br /> 15.50 <br /> 31.00 <br /> 46.50 <br /> 62.00 <br /> 77.50 <br /> 93.00 <br /> 108.50 <br /> 134.40 <br /> 155.00 <br /> 171.00 <br /> 197.00 <br /> 212.40 <br /> 228.00 <br /> 243.40 <br /> 259.00 <br /> 274.40 <br /> 290.00 <br /> 305.60 <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est CostRec Date LOCAL AGENCY <br />Joints-Replace <br />09/25/2023 <br />Str Target ROUTINE <br />Replaces the joint seals in conjunction with the place polyester overlay work. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Place Overlay <br />09/10/2019 <br />Str Target ROUTINE <br />Place polyester concrete overlay on the entire deck. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS