Laserfiche WebLink
Printed on:Tuesday 05/27/2025 03:59 PM 29C0057/AAAL/151929Pageof99 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Work By <br />Action <br />Action <br />Est Cost <br />Est Cost <br />Rec Date <br />Rec Date <br />LOCAL AGENCY <br />LOCAL AGENCY <br />Appr Roadway-Repair <br />Appr Roadway-Repair <br />01/02/2025 <br />01/27/2023 <br />Str Target <br />Str Target <br />ROUTINE <br />ROUTINE <br />Repair the Abutment 9 approach roadway pothole. <br />Replace the missing spacer blocks at the Abutment 4 right approach metal beam guard rail. <br />Dist Target <br />Dist Target <br />EA <br />EA <br />Status <br />Status <br />PROPOSED <br />PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Place Overlay <br />01/27/2023 <br />Str Target ROUTINE <br />Place polyester concrete deck overlay. <br />Dist Target <br />EA Status PROPOSED <br />WORK RECOMMENDATIONS