Laserfiche WebLink
Printed on:Wednesday 04/30/2025 02:29 PM 29C0105/AAAO/151727Pageof66 <br />Department of Transportation - Division of Maintenance Structure Maintenance & Investigations <br />OTHER WORK RECOMMENDATIONS <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Remove Vegetation <br />02/09/2023 <br />Str Target ROUTINE <br />Remove and kill the blackberry bushes from both sides and below Abutment 1. <br />Dist Target <br />EA Status PROPOSED <br />DECK WORK RECOMMENDATIONS <br />Work By <br />Action <br />Est Cost Rec Date LOCAL AGENCY <br />Deck-Methacrylate <br />02/09/2023 <br />Str Target ROUTINE <br />Remove the thin AC overlay and treat the deck with methacrylate. <br />Dist Target <br />EA Status PROPOSED <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br />SUBSTRUCTURE <br />SUBSTRUCTURE RATING =(60)8 <br />WORK RECOMMENDATIONS <br />(256) Slope Protection <br />Element DescriptionElem <br />No. <br />Env Total <br />Qty <br />Units <br />CS 1 CS 2 CS 3 CS 4 <br />Qty in each Condition StateDefect/ <br />Prot Defect <br />There were no significant defects noted.