PS-2301431 – Rider # 9 May 28, 2025 <br />SPECIAL CONDITIONS FOR <br />POCK LANE UNIT 1 PHASE 1 IMPROVEMENTS <br />ENCROACHMENT PERMIT <br /> <br />1. Work shall only be conducted by a California Class A licensed contractor. <br /> <br />2. Maintain traffic controls for all roads per the attached Traffic Control Plan. <br /> <br />3. PCMS shall be placed 72 hours in advance of the closure at Pock Lane and Carpenter Road, <br />Pock Lane & 8th street, and on D Street just before the closure. The PCMS boards shall describe <br />the closure, closure length, and how to access Kennedy Community Center during the closure. <br /> <br />4. Monroe Elementary School & Hamilton Elementary School shall be notified a minimum of 72 <br />hours prior to any closure. <br /> <br />5. SJ RTD shall be notified of any closure that impacts their existing routes 72 hours prior of any <br />closure. SJ RTD maps route maps can be found here: https://sanjoaquinrtd.com/systemmaps/. <br />6. Access to the Kennedy Community Center and Park shall be maintained at all times. <br /> <br />7. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />8. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />9. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />10. School Buses shall be passed through the work zone with minimal delays. <br /> <br />11. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br /> <br />12. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421. <br /> <br />13. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> <br />14. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of