Laserfiche WebLink
Department of Transportation - Division of Maintenance <br />Structure Maintenance & Investigations <br />SUBSTRUCTURE ELEMENT INSPECTION RATINGS AND NOTES <br />Elem Defect/ Element Description <br />Env Total <br />No. Prot Defect <br />Qty <br />(210) Pier Wall -RC <br />Riprap was placed around Pier 31. <br />215 Abutment -RC <br />2 17 <br />(215) Abutment -RC <br />There were no significant defects noted. <br />227 Pile -RC <br />2 4 <br />(60) SUBSTRUCTURE RATING = 7 <br />Units Qty in each Condition State <br />m 17 0 0 0 <br />ea. 0 4 0 0 <br />6000 Scour 2 4 0 4 0 0 <br />(227-6000) Scour <br />Riprap was placed in front of Abutment 34 but the 4 piles previously exposed are still visible. Refer to Photo 15. <br />228 Pile -Timber 2 1 ea. 1 0 0 0 <br />(228) Pile -Timber <br />The pile element is included to indicate the presence of piles on this structure. The piles were not exposed for visual inspection. No <br />indication of pile distress was noted in any substructure element. <br />256 Slope Protection 2 2 ea. 2 0 0 0 <br />(256) Slope Protection <br />Rock slope protection was placed along Abutment 34 and around Pier 31. <br />DECK WORK RECOMMENDATIONS - NONE <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />Rec Date 04/26/2023 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Super -Mist <br />Str Target ROUTINE <br />EA <br />Clean the top of the flanges of the bottom chords in the Truss Span by removing <br />any accumulated debris. <br />Rec Date 01/13/2020 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Super -Mist <br />Str Target ROUTINE <br />EA <br />Repair the damaged lower chords at the east portal, west portal, and at Panel Point 5. <br />SUBSTRUCTURE WORK RECOMMENDATIONS -NONE <br />OTHER WORK RECOMMENDATIONS <br />Rec Date 01/04/2022 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Paint Bridge Superst <br />Str Target ROUTINE <br />EA <br />Paint the bridge superstructure and the metal railing. <br />Printed on: Tuesday 06/10/2025 03:00 PM Page 9 of 9 29C0037/AABB/152574 <br />